Description
The City of Salina is seeking sealed‑bid contractors to replace and upgrade water distribution infrastructure across three neighborhoods (Dover Drive, 10th/11th Streets, and Larson Street). The work includes installation of ductile‑iron concrete‑lined (DICL) and standard water mains, fire hydrant and valve assemblies, resilient gate valves, water service connections, sanitary sewer line replacement, and extensive water‑meter pit modifications. All quantities are itemized, and the bid must be submitted by the deadline above.
• Phase 1 (Dover Drive): 12‑inch and 6‑inch DICL mains, 1,725 ft of 6‑inch water main, 2 fire hydrants, multiple valve and meter‑pit relocations.
• Phase 2 (10th & 11th Streets): 3,165 ft of 6‑inch water main, 7 fire hydrants, extensive service line installations (2‑inch, 1.5‑inch, 1‑inch), and numerous meter‑pit replacements/relocations.
• Phase 3 (Larson Street): 750 ft of 6‑inch water main, 2 fire hydrants, and targeted service line and meter‑pit work.
The contract documents are available for a $60 fee, and the city reserves the right to reject any or all proposals.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Nikki Goding(City Clerk)
(785) 309-5725