Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Montana
  4. ›Closed bids
  5. ›Butte-Silver Bow 2026 Cured in Place Pipe (CIPP) Project

City and County of Butte-Silver Bow·Montana

Butte-Silver Bow 2026 Cured in Place Pipe (CIPP) Project

Closes 8/26/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City-County of Butte-Silver Bow is seeking qualified contractors to submit bids for the Butte-Silver Bow 2026 Cured in Place Pipe (CIPP) Project. The project involves rehabilitating approximately 9,060 linear feet of sanitary sewer pipe using CIPP lining. The work includes furnishing and installing CIPP lining in compliance with the attached bid specification, reconnecting all active sewer services, and performing CCTV inspections before and after liner installation. The project is located in Butte, Montana, and the bid specification includes twenty-eight distinct pipe segments. • The project requires the contractor to verify all pipe diameters, pipe lengths, access manhole depths, and the number of active service connections prior to installation. • The contractor must provide bypass pumping for the sanitary sewer reach(s) upstream of the CIPP lining reach. • The finished liner shall be continuous for the entire length of the installation run between manholes and shall be free of visual defects. • The contractor shall remove all protruding taps identified during the pre-installation CCTV inspection or shown on the plan sheets prior to CIPP lining. • The contractor shall perform dye testing to determine whether a service is active or should be abandoned if the status of a service is questionable.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

(406) 782-5220

Key dates

Opened
8/6/2026
Pre-bid meeting
8/12/2026Mandatory
Closes
8/26/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237110

Budget estimate

$500,000 – $2,000,000

The budget for this project can be estimated based on the scope of work and industry standards. The project involves rehabilitating approximately 9,060 linear feet of sanitary sewer pipe using CIPP lining. The cost of CIPP lining can vary depending on factors such as pipe diameter, length, and location. However, a rough estimate for the cost of CIPP lining can be around $50 to $200 per linear foot, depending on the complexity of the project. Based on this, the total cost of the project could be estimated to be around $452,500 to $1,812,000. Additionally, the cost of bypass pumping, CCTV inspections, and other related work should also be considered. Therefore, a more realistic estimate for the budget could be around $500,000 to $2,000,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of Transportation·California

Top match · 74%

Trenchless culvert installation, cured-in-place pipeliner.

Closes 10/28/2026Opened 9/21/2026

U.S. Department Of Defense·Pennsylvania

73% match

Cured-In-Place Pipe (CIPP) Repair for DDSP - SP330027Q0002

Closes 10/13/2026Opened 10/8/2026

City of Portsmouth·Virginia

72% match

RFP#332-27-YE PIPE REHABILITATION SERVICES

Closes 10/19/2026Opened 9/8/2026

Mississippi

71% match

2026 Citywide Sewer CIPP Project

Closes 10/14/2026Opened 10/5/2026

Massachusetts Town of Chatham·Massachusetts

71% match

Cured-in-Place Pipe Lining

Closes 10/15/2026Opened 9/23/2026

City of Columbus Ohio·Ohio

71% match

Blueprint Miller‑Kelton Newton/Bedford Lateral Lining Project 1

Closes 10/14/2026Opened 9/16/2026

City of Mansfield·Ohio

70% match

2026 Sanitary Sewer Inflow and Infiltration Reduction Project

Closes 10/27/2026Opened 10/9/2026

City of Wheaton·Illinois

70% match

City of Wheaton 2026 Sewer Main Rehabilitation Project

Closes 10/26/2026Opened 10/9/2026

City of Lowell·Arkansas

69% match

Construction of Todd Place CIPP Project – Storm Sewer Rehabilitation

Closes 10/13/2026Opened 9/27/2026

Missouri Department of Transportation (MoDOT)·Missouri

69% match

Corrugated Metal Pipe - Southeastern Area - Southwest District

Closes 10/22/2026Opened 10/8/2026

Missouri Department of Transportation (MoDOT)·Missouri

69% match

Corrugated Metal Pipe - North Area - Southwest District

Closes 10/15/2026Opened 10/1/2026

Missouri Department of Transportation (MoDOT) Southwest District·Missouri

69% match

Corrugated Metal Pipe - Southwest Area - Southwest District

Closes 10/23/2026Opened 10/9/2026

Western Virginia Water Authority·Virginia

69% match

Invitation to Bid - FY27 Pipe Lining

Closes 10/13/2026Opened 9/21/2026

City of Waterloo·Illinois

69% match

2026 Sewer Lining - Waterloo, IL

Closes 10/15/2026Opened 10/1/2026

Missouri Department of Transportation (MoDOT) Southwest District·Missouri

69% match

Corrugated Metal Pipe - I-44 Corridor Area - Southwest District

Closes 10/20/2026Opened 10/6/2026

City of Wheaton·Illinois

69% match

City of Wheaton Sewer Main Rehabilitation PRoject

Closes 10/26/2026Opened 10/9/2026

Missouri Department of Transportation (MoDOT) Southwest District·Missouri

68% match

Corrugated Metal Pipe - Central Area - Southwest District

Closes 10/23/2026Opened 10/9/2026

Georgia Brunswick‑Glynn County Joint Water and Sewer Commission·Georgia

68% match

ITB No. 27-006 Construction Services for Basin 4001 and 4013 CIPP Rehabilitation

Closes 11/10/2026Opened 10/7/2026

Missouri Department of Transportation (MoDOT)·Missouri

68% match

Corrugated Metal Pipe - Western Area - Southwest District

Closes 10/19/2026Opened 10/5/2026

Missouri Department of Transportation·Missouri

68% match

Polypropylene Pipe - Western Area - Southwest District

Closes 10/22/2026Opened 10/8/2026

Massachusetts Town of Agawam·Massachusetts

68% match

Main Street Sewer Rehab Project

Closes 10/14/2026Opened 9/30/2026

Metropolitan Council·Minnesota

68% match

Coon Rapids 4-NS-525 Rehabilitation

Closes 11/3/2026Opened 9/24/2026

Missouri Department of Transportation (MoDOT)·Missouri

68% match

Polypropylene Pipe - Central Area - Southwest District

Closes 10/23/2026Opened 10/9/2026

City of Albany·Georgia

67% match

Albany Pipe Rehabilitation - Phase I

Closes 11/11/2026Opened 10/8/2026

California Department of Transportation·California

67% match

Reinforced concrete pipe trenchless installation method.

Closes 11/10/2026Opened 10/5/2026