The State of Oregon Department of Corrections is seeking bids for the complete replacement of the kitchen flooring at the Two Rivers Correctional Institution (TRCI) in Umatilla, OR. The contract covers demolition of existing floor systems, all labor, materials, equipment, transportation, and ancillary services required to install a new polymer‑cement floor system, along with required safety, security, and compliance measures for a correctional facility. The work must be performed under a competitive sealed‑bid process, with a mandatory pre‑bid conference and strict bonding, insurance, and apprenticeship requirements.
• Scope includes demolition, removal, and disposal of existing flooring, preparation of concrete substrates, installation of a self‑leveling cementitious underlayment, and placement of a fluid‑applied polyurethane‑cement floor system (minimum 3/8 in. dry film).
• Contractor must provide a 10 % bid security, performance and payment bonds equal to 100 % of the contract price, and maintain extensive insurance coverage (CGL, auto, workers’ comp, builder’s risk, etc.).
• Mandatory pre‑bid conference on 13 Oct 2026; all bids due 10 Nov 2026 2 PM PST. Liquidated damages of $405 per day apply for schedule overruns, and the project schedule allows ~250 days to substantial completion and ~280 days to final completion after notice to proceed.