Description
The Library of Congress is seeking a contractor to modernize the theatrical rigging control system for the historic Coolidge Auditorium. The current system is outdated and has been inoperable for over a year. The contractor will be required to remove the current system and provide a new one that unifies the existing subsystems into a single theater rigging control environment. The work must comply with historic preservation constraints, structural limitations, and restricted installation practices.
• The contractor must remove the current theatrical rigging control system.
• The contractor must provide a new theatrical rigging control system for the Coolidge Auditorium.
• The work must comply with historic preservation constraints, structural limitations, and restricted installation practices.
• The contractor must replace one curtain motor for the act and traveler curtains.
Attached files
The solicitation documents live at the source — open the bid source above to download them.