Ohio Turnpike and Infrastructure Commission is rebidding a threeâbridge replacement and rehabilitation project in Williams County, Ohio (Mileposts 6.0, 6.9, 7.7). The work includes full demolition of existing structures, installation of new steelâbeam bridges with composite concrete decks, replacement of interior beams, abutment and parapet work, extensive pavement removal and resurfacing, guardrail and barrier installation, drainage and utility coordination, trafficâcontrol planning, erosionâcontrol BMPs, and compliance with prevailingâwage, smallâbusinessâenterprise (10 % goal), drugâfree safety program, and environmental regulations. The contractor must provide bid guaranty, performance bond, nonâcollusion affidavit, SBE participation plan, and adhere to a strict 21âday advance notice for closure signage.
⢠Bridge demolition, new steelâbeam/Concrete deck installation, pile foundations, elastomeric bearings, and steel painting.
⢠Fullâdepth pavement removal, resurfacing, and new aggregate/base layers for three overâturnpike approaches.
⢠Trafficâcontrol, detour planning, guardrail, barrier, and erosionâcontrol BMP installation.
⢠Mandatory compliance with ODOT specifications, prevailingâwage statutes, SBE participation (10 % goal), drugâfree safety program, and environmental permits.