The Henry County Board of Commissioners is soliciting bids for the design‑build construction of a new hangar site at Atlanta Speedway Airport in Hampton, GA. The scope includes complete site‑work: clearing and grubbing, earthwork, subgrade preparation, base courses, concrete pavement, runway and taxiway markings, drainage structures, water distribution, sanitary sewers, utility installation, and landscaping/soil stabilization. All work must comply with FAA, GDOT, and federal specifications, and bidders must be pre‑qualified with the Georgia Department of Transportation and registered in SAM.gov. The contract will be awarded to the responsive, responsible bidder offering the lowest price and meeting all technical requirements.
• Site preparation, grading, and embankment construction
• Installation of base courses, concrete pavement, and asphalt layers
• Construction of storm‑drain and sanitary‑sewer systems, water distribution lines, and utility conduits
• Erosion‑control, sediment‑control, and mulching/seed‑and‑topsoil work
• Compliance with FAA Airport Improvement Program standards and GDOT specifications
• Mandatory performance and payment bonds, and adherence to strict quality‑control procedures.