Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More aerospace and defense bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›15--PLATE,STRUCTURAL,AIRCR

U.S. Department Of Defense·United States of America

15--PLATE,STRUCTURAL,AIRCR

Closes in 5 days$200k – $500kRequest for Quotation
Get bids like this by emailBid source

Description

The Defense Logistics Agency issued an RFQ for the procurement of 18 structural aircraft plates (NSN 1560016966952). The plates are to be delivered to the DLA Distribution Depot in Oklahoma within 165 days after order receipt. All responsible sources may submit electronic quotes; no hard‑copy solicitation, specifications, plans, or drawings are available. Approved sources are listed, but any qualified vendor may quote. • Quantity: 18 structural airframe plates (NSN 1560016966952) • Delivery location: DLA Distribution Depot, Oklahoma; 165‑day ADO requirement • Submission method: electronic quotation only; no hard‑copy solicitation • Approved source references provided, but open to all responsible sources • No technical specifications, plans, or drawings attached – quote based on standard industry knowledge

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
10/28/2026
Closes
11/4/2026
Duration
165 days

Last updated

Details

Type
Request for Quotation
Industry
Aerospace and Defense
NAICS
336413
Solicitation №
SPE4A527T2059

Budget estimate

$200,000 – $500,000

No contract value is disclosed. Based on typical pricing for aircraft structural plates, an order of 18 units could range from $200 k (if lower‑cost OEM parts) to $500 k (if higher‑spec or custom‑manufactured plates). The estimate considers material cost, manufacturing complexity, and logistics to an Oklahoma depot.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 93%

15--PLATE,STRUCTURAL,AIRCR

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

86% match

15--PANEL,LANDING,AIRCR

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Oklahoma

86% match

15--COVER,ACCESS,AIRCRAFT

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

86% match

15--WINDOW PANEL,AIRCRAFT

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·Oklahoma

86% match

15--FLAP,WING LANDING

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·Oklahoma

85% match

15--SKIN,AIRCRAFT

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

85% match

15--WINDSHIELD PANEL,AIRCR

Closes 11/3/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

85% match

15--SKIN,AIRCRAFT

Closes 11/1/2026Opened 10/19/2026

U.S. Department Of Defense·United States of America

85% match

15--WINDSHIELD PANEL,AIRCR

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

85% match

95--PLATE,METAL

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·Oklahoma

85% match

15--LATCH ASSEMBLY,AIRCRAF

Closes 11/5/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

85% match

15--SUPPORT,STRUCTURAL COM

Closes 11/3/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

84% match

42--PROTECTIVE COVER,AIRCR

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

84% match

16--GEARBOX ASSEMBLY,AIRCR

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

84% match

16--PANEL ASSY,I O AIRC

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

84% match

16--DIFFUSER,AIR,AIRCRA

Closes 11/4/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

84% match

15--TRAILING EDGE,AIRCRAFT

Closes 11/2/2026Opened 10/26/2026

U.S. Department Of Defense·Oklahoma

84% match

16--WHEEL,LANDING GEAR

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·United States of America

84% match

16--WIRING HARNESS,AIRCRAF

Closes 11/1/2026Opened 10/25/2026

U.S. Department Of Defense·California

84% match

61--PLATE ASSEMBLY,TERM

Closes 11/8/2026Opened 10/27/2026

U.S. Department Of Defense·United States of America

84% match

17--COVER,AIRCRAFT GROUND

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

83% match

62--LIGHT,COCKPIT,AIRCRAFT

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·United States of America

83% match

15--SUPPORT,STRUCTURAL COM

Closes 11/8/2026Opened 10/28/2026

U.S. Department Of Defense·Oklahoma

83% match

28--SEAL,METALLIC,AIRCRAFT

Closes 11/1/2026Opened 10/25/2026