Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›South Carolina
  4. ›Closed bids
  5. ›Nicholtown Area Galvanized Main Replacement

Greenville Water·South Carolina

Nicholtown Area Galvanized Main Replacement

Closes 9/17/2026$9M – $11MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Greenville, SC, is seeking a contractor to replace and upgrade its water distribution infrastructure in the Nicholtown area. The scope includes installing new galvanized water mains, adding fire hydrants, and providing all associated connections and appurtenances. This is a design‑bid‑build project with a straightforward construction focus. • Install approx. 23,000 LF of 6‑inch ductile iron pipe (DIP) water main. • Install approx. 10,000 LF of 8‑inch DIP water main. • Provide and install 35 fire hydrants with necessary hookups. • Supply all fittings, valves, backfills, testing, and related site work.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Joel Neuder(Agency Project Coordinator)

[email protected]

(864) 237-3059

Key dates

Opened
8/14/2026
Closes
9/17/2026

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110

Budget estimate

$9,000,000 – $11,000,000

Based on typical industry costs for ductile‑iron water main installation (roughly $250‑$350 per linear foot) plus fire hydrant installation (~$5,000‑$7,000 each), the total contract value is estimated between $9 million and $11 million. The wide range reflects variability in trenching conditions, material pricing, and local labor rates.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.