Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • South Carolina guideSouth Carolina Bids and Bidding Guide
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More waste removal and collection bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›South Carolina
  4. ›Closed bids
  5. ›RFP# 2027001 SPARTANBURG COUNTY 2026 WELLFORD LANDFILL EXPANSION PR…

Spartanburg County Government·South Carolina

RFP# 2027001 SPARTANBURG COUNTY 2026 WELLFORD LANDFILL EXPANSION PROJECT

Closes 8/20/2026$30M – $50MRequest for ProposalLogin required
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Wellford 2026 Landfill Expansion Project is a large‑scale civil‑engineering effort to enlarge the existing Class III landfill at 595 Little Mountain Road, Wellford, SC. The work includes extensive earth‑moving, site clearing, grading, structural fill, removal and replacement of unsuitable soils, installation of a low‑permeability clay liner, protective cover soils, HDPE geomembrane liner, drainage geocomposites, leachate collection and pump systems, and associated utility tie‑ins. The contract is evaluated 70 % on cost, 20 % on schedule, and 10 % on firm capabilities, and requires a 5 % bid bond. The County will award the contract after the Q&A period ends and bids are opened on 20 August 2026. • Major earthwork: ~45,300 CY excavation and 4,800 CY structural fill for Phase II, plus additional volumes for Phase VII Cell 2. • Liner system: 18,200 CY of 1 × 10⁻⁷ cm/s clay liner, 245,506 SF HDPE geomembrane, and 245,506 SF drainage geocomposite. • Leachate management: full collection system with HDPE pipe, sump, pumps, and force‑main, plus required testing and quality‑control documentation.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Gina Bennett(Procurement Manager)

[email protected]

(864) 596-2519

Key dates

Opened
7/1/2026
Questions due
8/7/2026
Pre-bid meeting
7/21/2026
Closes
8/20/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Utilities and Waste Management
NAICS
237120
Solicitation №
2027001

Budget estimate

$30,000,000 – $50,000,000

Based on the quantity of earthwork (≈ 45 k CY excavation, 4.8 k CY structural fill), the extensive liner system (≈ 245 k SF HDPE geomembrane and 18 k CY clay liner), and the complex leachate collection and pump infrastructure, a plausible contract value falls in the $30 million to $50 million range. The lower bound assumes modest unit costs for excavation and liner installation, while the upper bound reflects higher material prices, extensive quality‑control testing, and potential subcontractor overhead.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.