Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Compliance checkHow to Ensure RFP Compliance
  • How to answer an RFPChoosing and Responding to Government Bids
More energy and utilities bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Revitalization of the Uninterruptable Power Supply Amendment 0002
More bids in Illinois →

U.S. Department Of Defense·Illinois

Revitalization of the Uninterruptable Power Supply Amendment 0002

Closes 5/20/2026$250k – $500kRequest for Proposal
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The First Army is seeking a contractor to revitalize the Uninterruptable Power Supply (UPS) system that supports the Headquarters facility in building 68 on Rock Island Arsenal. The UPS cabinet and batteries are to remain in place, and the contractor must replace componentry with original equipment manufacturer parts from Schneider Electric. The scope of work includes delivery of all components, on-site certified service professionals to remove old componentry and install new componentry, configuration of the system, disposal of old componentry, and a one-year service agreement. The key aspects of the job include: • Replacement of UPS componentry with original equipment manufacturer parts from Schneider Electric • Delivery of all components and on-site installation • Configuration of the system to meet required supply specifications • Disposal of old componentry and a one-year service agreement • Compliance with strict safety protocols due to the high-voltage nature of the UPS system • Adherence to security and OPSEC requirements, including base access and background checks, escort requirements, and AT/FP Level I training.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sydney Johnson(Contract Specialist)

[email protected]

Key dates

Opened
4/22/2026
Closes
5/20/2026
Duration
12 months

Last updated

Details

Type
Request for Proposal
Industry
Energy and Utilities
NAICS
811210
Solicitation №
W519TC26QA127

Budget estimate

$250,000 – $500,000

The budget for this contract can be estimated based on the scope of work, which includes the replacement of UPS componentry, delivery and installation of new components, configuration of the system, and a one-year service agreement. The cost of the Schneider Electric Modular Revitalization kit, which includes the necessary components for the revitalization, is a significant factor in determining the budget. Assuming the cost of the kit is around $100,000 to $200,000, and adding the cost of labor, installation, and the one-year service agreement, the total budget can be estimated to be in the range of $250,000 to $500,000.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.