Description
The U.S. Army is seeking vendors to provide Boingo on-site Wi-Fi network capabilities in Camp Funston Barracks, supporting 371 users. The network must have capabilities to accommodate video conferencing, streaming, and other high-bandwidth applications, with minimum download speeds of 25 Mbps and upload speeds of 5 Mbps. The contractor must be available 24/7 for technical support or outages and able to report onsite within 24 hours of reported issue if necessary. The project is expected to start on 1 February 2026 and end on 15 April 2026.
Some key points to consider include:
• The ability to provide high-bandwidth Wi-Fi services
• Experience in providing similar services to large user bases
• Ability to provide 24/7 technical support
• Ability to report onsite within 24 hours of reported issue
• Compliance with the minimum download and upload speeds required
Attached files
The solicitation documents live at the source — open the bid source above to download them.