Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Tate County, Mississippi, Mississippi Delta Headwaters Project LD-2…
More bids in Mississippi →

U.S. Department Of Defense·Mississippi

Tate County, Mississippi, Mississippi Delta Headwaters Project LD-23-01

Closes 9/8/2026$5M – $20MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves constructing three grade control structures and Longitudinal Peaked Stone Toe Dikes with Tiebacks in Tate County, Mississippi. The work includes clearing and grubbing, excavation, backfill, embankment, control of water, storm water pollution prevention, and environmental protection. The requirement is set-aside for Woman-Owned Small Business (WOSB). Key aspects of the project include: • Construction of grade control structures • Installation of Longitudinal Peaked Stone Toe Dikes with Tiebacks • Clearing and grubbing • Excavation and backfill • Environmental protection and storm water pollution prevention

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Kasey Davis

[email protected]

(601) 631-7243

Key dates

Opened
7/22/2026
Closes
9/8/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
W912EE26BA006

Budget estimate

$5,000,000 – $20,000,000

The budget for this project is difficult to estimate without more information. However, based on the scope of work, which includes the construction of three grade control structures and Longitudinal Peaked Stone Toe Dikes with Tiebacks, the project likely requires significant resources and labor. A rough estimate for a project of this nature could be in the range of $5 million to $20 million, considering the costs of materials, equipment, and labor. Factors that may influence the likely payment range include the complexity of the project, the location, and the contractor's experience and reputation.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·Mississippi

Top match · 79%

Tate County, MS, MDHP, LD-23-02, FC/MRT, Yazoo River Basin, Hickahala Senatobia Watershed

Closes 9/18/2027Opened 7/22/2026

Neel-Schaffer, Inc·Mississippi

72% match

NS.19082 SAP-57(17)M Horace Holmes Drive & Jaguar Trail#20942

Closes 10/15/2026Opened 9/12/2026

Mississippi

69% match

Construction of 0.370 miles of maintenance road (Project SAP‑57(17)M) on Horace Holmes Drive and Jaguar Trail, Pike County, MS

Closes 10/15/2026Opened 10/1/2026

Neel-Schaffer, Inc·Mississippi

68% match

20464.000 SAP-23(14)M Roads "A" - "B"#20953

Closes 10/19/2026Opened 10/9/2026

Neel-Schaffer, Inc·Mississippi

68% match

SAP-57(18)M Roads "1A" & "1B" Magnolia-Progress Road and Road "2" River Road South#20923

Closes 10/14/2026Opened 9/11/2026

Mississippi

66% match

Construction of 11.819 Miles of Maintenance (Non‑Bridge) Roads “A‑B” – State Aid Program Project SAP‑23(14)M, Hancock County, MS

Closes 10/19/2026Opened 9/30/2026

Mississippi

66% match

Dredging of Bayous Near Gulf Coast Research Lab and Eagles Nest, Ocean Springs, MS

Closes 10/14/2026Opened 9/30/2026

U.S. Department Of Defense·Louisiana

66% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 4-2026 Specification No. OM26278

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

65% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 2/20/2028Opened 2/6/2026

California Grants·California

65% match

Proposition 1 Delta Water Quality and Ecosystem Restoration Grant Program

Rolling / TBD closeOpened 6/18/2025

Coahoma County Board of Supervisors·Mississippi

64% match

Coahoma County Board of Supervisors; Moon Lake Road Bridge & Approaches ERBR-SAP-14(83) Project

Closes 10/20/2026Opened 9/29/2026

U.S. Department Of Defense·Michigan

64% match

9-Mile Pump Station

Closes 10/20/2026Opened 10/7/2026

George County Board of Supervisors·Mississippi

64% match

SABP-20(01) Box Culverts and Approaches on Broome School Road

Closes 10/22/2026Opened 9/17/2026

Mississippi Department of Health·Mississippi

64% match

Mississippi Partnership for Comprehensive Cancer Control Coalition

Closes 10/20/2026Opened 8/17/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 1-2025 (OM25275)

Closes 2/3/2027Opened 3/28/2025

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 7-2026 (OM26007)

Closes 5/7/2028Opened 4/15/2026

California Grants·California

64% match

Delta Community, Environment, and Climate Grant Program

Closes 10/22/2026Opened 9/17/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 1-2026 Specification No. OM26275

Closes 4/15/2028Opened 4/16/2026

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to the Gulf, Head of Passes, Hopper Dredge Disposal Area, Project #24-2, Plaquemines Parish, LA (ED 24-009)

Closes 12/4/2026Opened 12/5/2024

U.S. Department Of Defense·Louisiana

64% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Hopper Dredge Contract No. 5-2025 (OM25005)

Closes 3/23/2027Opened 2/4/2025