Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arkansas
  4. ›Closed bids
  5. ›Intake Structure

City of Ola·Arkansas

Intake Structure

Closes 8/26/2026$500k – $1MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Ola is seeking bids to construct an intake structure that will extend its raw‑water intake further into the lake, improving water quality. The work includes installing a submerged 12‑inch HDPE DR17 pipeline from the existing intake tower to a deeper lake‑bed terminus, constructing a reinforced concrete foundation for the new underwater intake, adding dual passive cylindrical wedge‑wire T‑screens, and installing five high‑visibility regulatory warning buoys around the pipeline. The contract will be awarded to the lowest responsive and responsible bidder, with a mandatory 5 % bid security and compliance with prevailing‑wage requirements. The project must be completed within 90 consecutive calendar days. • Install 12‑in HDPE DR17 pipe and associated underwater intake components. • Construct a 6′ × 6′ reinforced concrete foundation and dual T‑screens. • Deploy five regulatory warning buoys in a 300‑ft radius around the pipeline. • Provide bid security equal to 5 % of the base bid and adhere to state prevailing‑wage rates. • Complete all work within a 90‑day schedule.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

James Dreher(Team Leader, Infrastructure Division)

(501) 224-1000

Key dates

Opened
8/9/2026
Closes
8/26/2026
Duration
90 days

Last updated

Details

Type
Invitation for Bid
Industry
Water Management and Sanitation
NAICS
237110
Solicitation №
24RU40030

Budget estimate

$500,000 – $1,000,000

Based on typical costs for 12‑inch HDPE pipeline installation, reinforced concrete foundations, specialized T‑screens, and safety buoys, a 90‑day construction effort in Arkansas is likely to fall between $0.5 million and $1 million. Factors influencing the range include material prices (HDPE pipe, concrete, steel), labor rates (prevailing‑wage compliance), mobilization of equipment for underwater work, and the need for specialized installation crews.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

U.S. Department Of Defense·United States of America

Top match · 63%

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

62% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

62% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·Kentucky

62% match

Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020

Closes 11/6/2026Opened 10/9/2026

U.S. Department Of Defense·United States of America

61% match

29--FILTER ELEMENT,INTAKE

Closes 10/22/2026Opened 10/12/2026

U.S. Department Of Defense·United States of America

61% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

61% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

59% match

43--AIR CLEANER,INTAKE

Closes 10/19/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

59% match

29--FILTER ELEMENT,INTAKE

Closes 10/15/2026Opened 10/5/2026

U.S. Department Of Defense·United States of America

58% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

43--AIR CLEANER,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

58% match

29--FILTER ELEMENT,INTAKE

Closes 10/18/2026Opened 10/4/2026

U.S. Department Of Defense·United States of America

57% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

57% match

29--AIR CLEANER,INTAKE

Closes 10/22/2026Opened 10/12/2026

U.S. Virgin Islands GVIBUY·U.S. Virgin Islands

57% match

Purchase and Installation of UP/DOWN Exhaust and Fresh Air Intake System for VIDA on STX

Closes 10/19/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

57% match

43--FILTER ELEMENT,INTAKE

Closes 10/20/2026Opened 10/6/2026

U.S. Department Of Defense·United States of America

57% match

66--INLET STACK

Closes 10/18/2026Opened 10/7/2026

U.S. Department Of Defense·United States of America

56% match

29--FILTER ELEMENT,INTAKE

Closes 10/14/2026Opened 10/5/2026

The Metropolitan Water District of Southern California·California

56% match

Foothill Feeder Pressure Control Structure Chemical Injection Stage 1

Closes 10/15/2026Opened 9/23/2026

U.S. Department Of Defense·Ohio

56% match

25--FRAME SECTION,STRUCTUR

Closes 10/14/2026Opened 9/29/2026

U.S. Department Of Defense·United States of America

56% match

47--STACK,EXHAUST

Closes 10/14/2026Opened 10/4/2026

U.S. Department Of Defense·United States of America

55% match

25--STEP ASSEMBLY,FUEL TAN

Closes 10/19/2026Opened 10/5/2026

U.S. Department Of Defense·Oklahoma

55% match

Injector Assembly

Closes 11/6/2026Opened 10/6/2026