Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • California guideCalifornia Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Construction
  5. ›Place HMA, replace signs, MBGR, TMS and drainage systems.

California Department of Transportation·California

Place HMA, replace signs, MBGR, TMS and drainage systems.

Closes 12/10/2026$1.2M – $2.4MInvitation for Bid
Get bids like this by emailBid source

Description

This Caltrans project calls for the placement of new hot‑mix asphalt and the replacement of roadway signs, modular bridge guardrails (MBGR), traffic‑management systems (TMS), and drainage structures across a rural stretch in Mendocino County, extending to the Humboldt County line. The work is valued at roughly $24 million and will be executed over an estimated 200 working days once awarded. Qualified contractors must hold a California Class A or Class C‑12 license. The bid package becomes available on 26 Oct 2026, with the final bid submission deadline on 10 Dec 2026. • Scope: HMA placement, sign replacement, guardrail (MBGR) and traffic system (TMS) upgrades, drainage repairs. • Location: Mendocino County, CA – from T‑91.3/T‑106.8 (Leggett) to the Humboldt County line near Piercy. • Schedule: 200 working days of construction; bid opening 10 Dec 2026. • Value: Estimated contract value $24 M; requires Class A or C‑12 contractor license. • Procurement: Electronic bidding (Invitation for Bid) with no mandatory pre‑bid meeting or site visit.

Attached files

Contact

[email protected]

(916) 227-6299

Key dates

Opened
10/26/2026
Closes
12/10/2026
Duration
200 days

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
01-0J9904

Budget estimate

$1,200,000 – $2,400,000

The contract is estimated at $24 M. Assuming a typical contractor profit margin of 5 %–10 % for large infrastructure projects, the net earnings for the prime contractor would likely range between $1.2 M and $2.4 M. Margins could vary based on subcontractor costs, mobilization expenses, and change orders.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

California Department of Transportation·California

Top match · 88%

Replace bridge & culverts, HMA, RHMA, Mod lighting & erosion control.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

86% match

Rdwy excavation, place HMA and HFST, install APC and concrete barrier.

Closes 12/8/2026Opened 10/19/2026

California Department of Transportation·California

86% match

HMA-A, cold plane AC, concrete barrier, and electrical.

Closes 11/10/2026Opened 10/5/2026

California Department of Transportation·California

86% match

Cold plane and place HMA, replace culverts and replace delineation.

Closes 12/2/2026Opened 10/26/2026

California Department of Transportation·California

85% match

Cold plane, HMA, curb ramp, culvert, and modify electrical system.

Closes 11/18/2026Opened 10/12/2026

California Department of Transportation·California

85% match

RHMA, HMA, and concrete barrier.

Closes 11/3/2026Opened 9/14/2026

California Department of Transportation·California

84% match

Curb ramp, CRCP, JPCP, HMA, electrical, erosion control, and planting.

Closes 11/17/2026Opened 9/28/2026

California Department of Transportation·California

84% match

Thermoplastic traffic stripe, partially grouted RSP, Rdwy Exc, & HMA.

Closes 12/8/2026Opened 10/26/2026

California Department of Transportation·California

84% match

Replace AC Surf, RHMA overlay, drainage, curb ramps, & electrical.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

84% match

Replace drainage systems.

Closes 12/9/2026Opened 10/19/2026

California Department of Transportation·California

84% match

Roadway excavation, HMA, and structural concrete.

Closes 12/17/2026Opened 10/26/2026

City of Morgan Hill·California

84% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/27/2026

California Department of Transportation·California

84% match

Construct RW, SW, HMA Pvmt, drainage, and Elect systems.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

83% match

Reconstruct roadway and drainage system, & construct ADA facilities.

Closes 12/9/2026Opened 10/26/2026

California Department of Transportation·California

83% match

Construct new interchange, Rdwy Ex, IB, HMA, RHMA, & structural Conc.

Closes 11/19/2026Opened 9/28/2026

California Department of Transportation·California

83% match

Slab replacement, RHMA paving, modify signal and lighting systems.

Closes 12/1/2026Opened 10/5/2026

Modoc County Road Department·California

83% match

FOR CONSTRUCTION OF MODOC COUNTY ROAD 1 REHABILITATION PROJECT FROM THE INTERSECTION OF COUNTY ROAD 9 TO THE B.L.M. BOUNDARY

Closes 11/12/2026Opened 10/1/2026

California Department of Transportation·California

83% match

Mod Sig & Ltg, Pvmt repair, SW, curb ramp, segmental Conc Ret system.

Closes 11/5/2026Opened 10/5/2026

City of Morgan Hill·California

83% match

Monterey Road Traffic, Bicycle, and Pedestrian Improvements Project

Closes 11/24/2026Opened 10/23/2026

California Department of Transportation·California

82% match

Modify existing drainage, replace lighting systems, and install TMS.

Closes 11/17/2026Opened 9/28/2026

California Department of Transportation·California

82% match

Cold plane, HMA, RHMA, bridge rehab, culvert, and electrical work.

Closes 11/10/2026Opened 9/21/2026

California Department of Transportation·California

82% match

Construct GSRD, DPPIA and install irrigation system.

Closes 12/8/2026Opened 10/19/2026

California Department of Transportation·California

82% match

Const SW,curb ramps,Pvmt,install & Mod Elect systems,drainage systems.

Closes 12/16/2026Opened 10/26/2026

California Department of General Services·California

82% match

CONTRACT NUMBER: 26-330888; CHPERS I: REPLACEMENT OF TOWERS AND VAULTS ¿ LEVIATHAN PEAK CALIFORNIA HIGHWAY PATROL ALPINE COUNTY, CA ; PROJECT NUMBER: 122805LL

Closes 11/17/2026Opened 8/21/2026

California Department of Transportation·California

82% match

Replace bridge, widen Rdwy, railroad, drainage, Elect and landscape.

Closes 11/18/2026Opened 10/5/2026