Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • North Dakota guideNorth Dakota Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›North Dakota
  4. ›Closed bids
  5. ›UND - Armory Ground Water Mitigation

University of North Dakota·North Dakota

UND - Armory Ground Water Mitigation

Closes 8/5/2026$200k – $400kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The University of North Dakota is seeking a qualified contractor to design and construct a complete groundwater mitigation system for the Armory building. The work includes excavation, installation of footing drain tile, foundation waterproofing, a sump basin with pump, and connecting discharge piping to the existing catch basin, all to be completed within a two‑month window. • Excavate the west end of the Armory, install footing drain tile, and apply foundation waterproofing. • Provide and install an 18‑inch (or larger) sump basin, sub‑mersible pump, and associated discharge piping to the existing storm‑sewer catch basin. • Perform all related site work, including erosion control, grading, and restoration to original conditions; comply with NEC, OSHA, and local building codes. • Deliver all required documentation (North Dakota Contractor’s License, insurance certificates, performance & payment bonds, and tax clearance) through UND’s Jaggaer portal. • Pre‑bid walk‑through is scheduled for July 28 2026 (optional but highly recommended).

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Jason Gallagher

[email protected]

Key dates

Opened
7/14/2026
Pre-bid meeting
7/28/2026
Closes
8/5/2026
Duration
2 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237110
Solicitation №
FM-348-2027

Budget estimate

$200,000 – $400,000

Based on comparable university campus groundwater mitigation projects of similar scope (excavation, waterproofing, sump‑pump installation, and piping), the contract value is likely in the low‑to‑mid six‑figure range. Assuming a 2‑month schedule, labor rates of $80‑$120 per hour, equipment mobilization, material costs (drain‑tile, waterproofing membrane, sump basin, pump, pipe), and the required insurance/bond premiums, a reasonable estimate falls between $200,000 and $400,000. The range accounts for potential site‑specific variability, unforeseen conditions, and the requirement for full insurance coverage.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.