Description
The Village of Hoffman Estates is seeking sealed bids for a comprehensive water‑main rehabilitation on Shoe Factory Road. The contract covers removal of existing deteriorated water‑main components, installation of a new 16‑inch ductile‑iron pipe and cured‑in‑place pipe (CIPP), associated valve vaults, fire‑hydrants, trench back‑filling, parkway and asphalt restoration, tree protection, erosion control, dust‑control watering, and full environmental monitoring. The work must comply with IDOT specifications, include hydrostatic testing, and meet strict performance and warranty bond requirements.
• Scope includes ~1,900 ft of water‑main replacement (ductile‑iron and CIPP) plus extensive civil works (asphalt, parkway, erosion control).
• Mandatory sealed‑bid submission by July 8 2026 10:00 AM; questions due by July 2 2026 4:00 PM.
• Requires performance bond ($20 k), warranty bond (5 % of contract or $25 k), and compliance with regulated‑substances monitoring, tree‑protection, and diesel‑retrofit provisions.
Attached files
The solicitation documents live at the source — open the bid source above to download them.