The City of Port St. Lucie is seeking a qualified contractor to construct roadway, intersection and multimodal improvements at the Tradition Parkway and Village Parkway intersection. The work includes pavement resurfacing and widening, curb‑and‑gutter, concrete separators, sidewalk and pedestrian facility reconstruction, drainage, grading, traffic signal conduit, temporary traffic control, storm‑water management, signing, pavement marking and lighting adjustments. The contract term is nine months from execution, with all labor, materials, equipment and permits supplied by the contractor. The procurement schedule includes a release date of 9 Sept 2026, a non‑mandatory pre‑proposal meeting on 14 Sept 2026, question deadline 16 Sept 2026, and final bid submission deadline 1 Oct 2026. The City will evaluate bids and award one or more contracts; the award date is not specified.
• Location: Intersection of Tradition Pkwy & Village Pkwy, Port St. Lucie, FL
• Scope: Full civil construction of the intersection (paving, curbs, sidewalks, drainage, signal conduit, traffic control, lighting, signage)
• Contract length: 9 months (initial)
• Submission method: Electronic via OpenGov portal; required forms include bid bond, insurance, licenses, etc.
• Key dates: Release 9 Sept 2026, Pre‑bid 14 Sept 2026 (non‑mandatory), Questions by 16 Sept 2026, Answers by 23 Sept 2026, Bid deadline 1 Oct 2026 3:30 PM
• Mandatory requirements: All work must be performed within city right‑of‑way hours (7 AM–sunset, weekdays) unless a noise permit is obtained; night/weekend work requires prior notice.
• Evaluation: Based on price and compliance with specifications; the City may waive minor deviations but reserves the right to reject non‑responsive bids.