The United States Coast Guard is seeking a contractor to inspect, overhaul, and test two relief valves (PN: S8LJE‑02RF1‑03RF1‑SS‑H2‑TB) for the icebreaker USCGC HEALY. Work must be performed at the contractor’s facility and include disassembly, cleaning, detailed inspection, replacement of all soft‑goods with genuine OEM parts, reassembly, hydrostatic and leakage testing, and delivery of condition‑found and test reports. The Government will supply the two valves and ship them to the contractor, who must return them to the Seattle base within two days of completion. The period of performance is 15 days from award, with a potential additional repair budget not to exceed $1,500. All travel, material, or extra field‑service costs require prior approval.
• Scope: Disassembly, cleaning, inspection, overhaul, reassembly, testing, reporting for 2 relief valves.
• Location: Contractor’s facility; valves shipped from USCG Seattle base.
• Performance window: 15 days after award.
• Government‑furnished property: 2 relief valves; shipping both ways required.
• Budget: Base scope (labor, materials, equipment) plus up to $1,500 for unforeseen repairs; additional work subject to written modification.
• Deliverables: Condition Found Report, calibrated Test Report, metallic calibration tag.
• Primary contact: Justin Wooldridge (USCG).