The Narragansett Bay Commission is seeking a single contractor to perform comprehensive concrete sidewalk and stair repairs at two wastewater‑treatment facilities (Field’s Point and Bucklin Point). The work includes demolition of existing concrete, site preparation, new 4000 psi air‑entrained concrete placement, installation of expansion joints, welded wire fabric, curing and sealing, and restoration of curb stones and railings. All work must comply with ACI, ASTM, and Rhode Island prevailing‑wage requirements, and be completed by 15 June 2027.
• Locations: Pretreatment Building (FPWWTF) and Digester Control Building (BPWWTF) wastewater facilities in Providence, RI.
• Scope: Demolition, re‑grading, new concrete sidewalks (4 ft wide, 6 in. thick), repair of three concrete stair assemblies, joint and sealant installation, and associated finish work.
• Requirements: Mandatory pre‑bid meeting (24 Sept 2026), questions due 01 Oct 2026, bid submission due before 08 Oct 2026, compliance with state equal‑opportunity and prevailing‑wage statutes, one‑year warranty, insurance certificates 48 hrs before start.
Attached files
The solicitation documents live at the source — open the bid source above to download them.
Contact
Eugene Sorkin(Technical/Questions Contact)