Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • How to answer an RFIRFI Meaning: What Is an RFI?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2
More bids in Oregon →

U.S. Department Of Defense·Oregon

Mouth of the Columbia River (MCR) North Jetty Repair Project Phase 2

Closes 7/3/2026$10M – $50MRequest for Information
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The U.S. Army Corps of Engineers is seeking information from industry parties regarding their interest, capabilities, and qualifications for the Mouth of the Columbia River (MCR) North Jetty Rehab Project Phase 2. The project involves repairing offshore ocean side damage to the North Jetty, which is located at the southwest corner of Washington State near Ilwaco, WA. The project requires the repair and reconstruction of approximately 900 feet of the jetty trunk, with an estimated stone volume of 11,100 cubic yards and a minimum stone density of 185 pounds per cubic foot. The project also includes optional repairs to 2,750 feet of jetty trunk. The government is seeking information from both large and small business members of industry, including Small Business, Small Disadvantaged Businesses, Historically Underutilized Business Zones (HUBZone), Woman Owned Small Business (WOSB), Service-Disabled Veteran-Owned Small business (SDVOSB), and Veteran Owned Small Business (VOSB). • The project requires the construction of a jetty crest haul road and a staging area to store the large quantity of jetty armor stone. • The project involves the placement of new jetty armor stone, with an expected stone size of 20-40 tons each. • The project is expected to be completed by the end of calendar year 2028. • The government anticipates awarding one Firm Fixed-Price contract. • The project has specific constraints and challenges, including river-induced currents, tidal currents, wave-induced currents, and high-speed coastal winds.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Christopher Burroughs(Contracting Specialist)

[email protected]

Key dates

Opened
2/25/2026
Closes
7/3/2026
Projected award
12/1/2026
Duration
24 months

Last updated

Details

Type
Request for Information
Industry
Civil Engineering
NAICS
237990
Solicitation №
PAN25P04540

Budget estimate

$10,000,000 – $50,000,000

The budget for this project can be estimated based on the estimated stone volume and the minimum stone density. The project requires approximately 11,100 cubic yards of stone, with a minimum density of 185 pounds per cubic foot. Assuming an average cost of $100 per cubic yard of stone, the total cost of the stone would be approximately $1,110,000. However, this is only a small portion of the total project cost, which would also include labor, equipment, and other expenses. Based on the project description, the total budget for the project could be in the range of $10 million to $50 million. The actual budget will depend on various factors, including the contractor's bid, the complexity of the project, and the government's budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

New York City Department of Parks & Recreation·New York

Top match · 70%

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

U.S. Department Of Homeland Security·Maryland

68% match

USCG ANT SAGINAW RIVER (49422) & USCG ANT DETROIT (49424) FY27 INDUSTRIAL REPAIR

Closes 10/16/2026Opened 9/16/2026

Environmental Conservation, NYS Department of·New York

68% match

Hudson River Estuary Round 50 Tributary Restoration and Resiliency

Closes 12/17/2026Opened 9/25/2026

U.S. Department Of Defense·Missouri

68% match

MSD Infrastructure Repairs Phase 2

Closes 6/23/2027Opened 6/23/2026

U.S. Department Of Defense·Iowa

68% match

Mississippi River Basin Bettendorf, Iowa Local Flood Protection Bettendorf, Iowa 2024 Event PL84-99 Flood Repairs

Closes 10/28/2026Opened 10/13/2026

U.S. Department Of Defense·Pennsylvania

68% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/15/2026Opened 9/1/2026

U.S. Department Of Defense·Louisiana

68% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 3-2026 Specification No. OM26277

Closes 4/15/2028Opened 4/15/2026

U.S. Department Of The Interior·Colorado

68% match

CHOH 326202 Repair Historic Potomac River Dams 4 a

Closes 10/15/2026Opened 9/15/2026

Environmental Conservation, NYS Department of·New York

67% match

Hudson River Estuary Grants for River Access Round 49

Closes 12/17/2026Opened 9/28/2026

U.S. Department Of Defense·Illinois

67% match

Sources Sought/Request for Information Upper Mississippi River Restoration (UMRR) – Quincy Bay Habitat Rehabilitation and Enhancement Project- Stage 1

Closes 10/26/2026Opened 9/22/2026

U.S. Department Of Defense·Washington

67% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 6/15/2026

New York City Department of Parks and Recreation·New York

67% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruction

Closes 11/2/2026Opened 9/21/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to the Gulf, Southwest Pass Maintenance Dredging Non- Continuous Mile 6.0 AHP to Mile 19.5 BHP Cutterhead Dredge No. 2-2026 Specification No. OM26276

Closes 2/20/2028Opened 2/6/2026

U.S. Department Of Defense·Louisiana

67% match

Mississippi River, Baton Rouge to Gulf of Mexico, Southwest Pass Maintenance Dredging, Non-Continuous Mile 6.0 AHP to Mile 19.5 BHP, Cutterhead Dredge No. 3-2025 (OM25277)

Closes 2/3/2027Opened 11/21/2024

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

State of Delaware NAT·Delaware

67% match

Indian River Marina Bulkhead Repairs

Closes 10/27/2026Opened 9/29/2026

City of Cedar Rapids·Iowa

67% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

U.S. Department Of Defense·Washington

67% match

Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract

Closes 12/1/2026Opened 9/30/2026

Nyc Department of Parks and Recreation·New York

66% match

CNYG-223M Citywide Seawall Reconstruction

Closes 11/2/2026Opened 9/3/2026

Environmental Conservation, NYS Department of·New York

66% match

Hudson River Estuary Grants for Local Stewardship Planning Round 51

Closes 12/17/2026Opened 9/28/2026

U.S. Department Of Defense·Kansas

66% match

Fall River Lake and Dam Damsite Park Lagoon Repair

Closes 10/20/2026Opened 9/30/2026

U.S. Department Of Defense·Pennsylvania

66% match

JP Murtha Float Mooring Bitts Retrofit

Closes 11/5/2026Opened 10/6/2026

Department of Natural Resources·South Carolina

66% match

Charleston-Fort Johnson Boat Slip Renovation - Spoil Site Repair and Dredge

Closes 11/5/2026Opened 10/7/2026

U.S. Department Of Defense·Oregon

66% match

Bonneville Lock and Dam - Navigation Lock 1 Bridge Replacement

Closes 10/29/2026Opened 10/1/2026

Virginia Department of Transportation·Virginia

66% match

IFB 161177 Hydraulic Cylinder Replacement

Closes 10/19/2026Opened 9/28/2026