Description
The City of Trenton is seeking proposals from qualified engineering firms to prepare a Stormwater Pollution Prevention Plan (SPPP), Drainage Control Plan (DCP), Drainage Control Map (DCM), and related NJDEP compliance documentation for the City's Facility. The selected firm will evaluate existing site conditions, prepare all required permit documentation, assess compliance with applicable NJDEP requirements, and provide recommendations for stormwater management and ongoing operational compliance. The scope of work includes existing conditions assessment, stormwater pollution prevention plan, drainage control plan, drainage control map, and compliance evaluation.
• The proposal should include a company profile, qualifications and experience of the firm, resumes of key personnel, description of similar projects, proposed project schedule, technical approach and methodology, references, and proof of professional liability insurance.
• The proposal should also include a detailed cost proposal, broken down into phases, including stormwater pollution prevention plan, drainage control plan, drainage control map, and recommendations for drainage control.
• The City of Trenton reserves the right to terminate the contract due to breach or default of the selected Proposer.
Attached files
The solicitation documents live at the source — open the bid source above to download them.