Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Pricing your quoteWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an RFQRFQ Meaning: What Is an RFQ?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›Sand Trail Phase II
More bids in Oregon →

U.S. Department Of Agriculture·Oregon

Sand Trail Phase II

Closes 9/10/2026$500k – $2MRequest for Quotation
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The project involves repairing and mitigating future failures of the USFS Sand Trail infrastructure, trail number 229, in the Chugach National Forest. The contract aims to install bank armoring with rip rap and place sub-grade aggregate along the trail. The work must be performed during low water times of the year, and the contractor must comply with various regulations and specifications, including those related to environmental protection and labor standards. The contract has a total duration of 238 days, from September 24, 2026, to May 31, 2027. Some key aspects of the project include: • The contractor must install bank armoring with rip rap and place sub-grade aggregate along the trail. • The work must be performed during low water times of the year. • The contractor must comply with various regulations and specifications, including those related to environmental protection and labor standards. • The contract has a total duration of 238 days, from September 24, 2026, to May 31, 2027. • The contractor must provide a bid bond (20%) if the total priced quote exceeds $150,000. • The contractor must provide performance and payment bonds (100% each) if the award is greater than $150,000.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Eric Oldenkamp(Contracting Officer)

[email protected]

(541) 225-6321

Key dates

Opened
8/7/2026
Questions due
8/25/2026
Closes
9/10/2026
Duration
238 days

Last updated

Details

Type
Request for Quotation
Industry
Civil Engineering
NAICS
237990
Solicitation №
1240BJ26Q0021

Budget estimate

$500,000 – $2,000,000

Based on the provided information, the budget for this project could range from $500,000 to $2,000,000. This estimate is influenced by the scope of work, which includes the installation of bank armoring and placement of sub-grade aggregate along a 1.70-mile section of trail. The cost of materials, labor, and equipment, as well as the need for specialized expertise and compliance with environmental regulations, may also impact the final budget.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

Harris County·Georgia

Top match · 67%

Man-O-War Trail, Phase VI

Closes 1/18/2027Opened 12/5/2022

Maryland Department of Natural Resources·Maryland

65% match

Trail Ph 2 - Construction at Gathland State Park

Closes 11/2/2026Opened 10/9/2026

Maryland Department of Natural Resources·Maryland

65% match

Battlefield Trail Ph. 2 Construction at Gathland State Park

Closes 10/28/2026Opened 9/22/2026

Georgia Cobb County Department of Transportation·Georgia

63% match

B2432 - Chattahoochee River Trail, Phase II

Closes 1/15/2027Opened 9/28/2026

Georgia Harris County Commissioners·Georgia

63% match

Construction of the Man O'War Trail Phase VII

Closes 11/10/2026Opened 10/1/2026

City of Keene·New Hampshire

63% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Green Cove Springs·Florida

63% match

St. Johns River Trail - Phase 1 (Design)

Closes 11/9/2026Opened 10/8/2026

City of Keene·New Hampshire

63% match

THT Phase#2, NHDOT#45251 Design Project

Closes 11/19/2026Opened 10/9/2026

City of Smithville·Missouri

62% match

RFP 26-15 Riverwalk Trail - Smithville, MO

Closes 10/27/2026Opened 9/28/2026

Alaska Department of Transportation and Public Facilities·Alaska

62% match

RTP Grant Application - Eastland Trails Phase 2A

Rolling / TBD closeOpened 9/24/2026

Virginia Department of Transportation·Virginia

61% match

B02_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

City of Smithville, MO·Missouri

61% match

RFP 26-14 Second Creek Sidewalk - Smithville, MO

Closes 10/27/2026Opened 9/28/2026

Parks Recreation & Historic Preservation, NYS Office of·New York

61% match

Avenue of the Pines Trail Reroute at Saratoga Spa State Park

Closes 10/15/2026Opened 9/17/2026

St. Johns County - Purchasing Department·Florida

61% match

South Ponte Vedra Beach Nourishment – FEMA CAT-G Project

Closes 11/6/2026Opened 10/7/2026

U.S. Department Of Defense·Alabama

61% match

Coastwide Beach and Dune Ecosystem Restoration

Closes 10/30/2026Opened 9/28/2026

City of Little Rock·Arkansas

61% match

JONESBORO DR. CHILDREN’S TRAIL (LITTLE ROCK)

Closes 10/15/2026Opened 9/20/2026

Virginia Department of Transportation·Virginia

60% match

B23_2026 PROPOSED TRAIL

Closes 10/28/2026Opened 9/9/2026

Columbus Consolidated Government·Georgia

60% match

Dragonfly Trail - River Road Segment

Closes 10/21/2026Opened 8/18/2026

Municipality of Anchorage·Alaska

60% match

Old Seward Highway Surface Rehabilitation – International Airport Road to Tudor Road – Phase 2

Closes 10/29/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

60% match

TAP-3302(450) KC District, City of Smithville. construction of a multiuse trail in the community.

Closes 10/27/2026Opened 9/29/2026

U.S. Department Of Defense·Maryland

60% match

Mid-Bay James Island Restoration Phase 2

Closes 10/22/2026Opened 10/7/2026

Missouri Department of Transportation·Missouri

60% match

SE District, City of Dexter, add additional walk trail(s) connecting the Dexter High School and the Dexter Middle School.

Closes 10/19/2026Opened 9/14/2026

City of Maryville·Missouri

60% match

South Main Trail Connection Project - Maryville, MO

Closes 11/10/2026Opened 10/8/2026

Virginia Department of Transportation·Virginia

59% match

B05_2026 SCENIC TRAIL CONSTRUCTION

Closes 10/28/2026Opened 8/11/2026

County of Dorchester, SC·South Carolina

59% match

Ashley River Scenic Blue Trail Obstruction Clearing

Closes 10/21/2026Opened 9/23/2026