Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Oklahoma guideOklahoma Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Oklahoma
  4. ›Closed bids
  5. ›Bradbury Corner Stormwater Infrastructure Improvements Project

City of Edmond·Oklahoma

Bradbury Corner Stormwater Infrastructure Improvements Project

Closes 8/11/2026$500k – $2MInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The City of Edmond Public Works Authority is seeking bids for the construction of the Bradbury Corner Stormwater Infrastructure Improvements Project. The project involves furnishing all required materials, supplies, equipment, tools, and plans to perform all necessary labor for the construction of the project. The work shall be done in accordance with plans and specifications on file in the City Engineer's Office. • The project includes the construction of stormwater infrastructure improvements, such as excavation, temporary silt fence, inlet protection, solid slab sodding, and removal of trees. • The project also includes the installation of aggregate base type A, stabilized subgrade, 5" concrete sidewalk, 6" concrete driveway, and 6" asphalt paving. • The project requires the removal of existing structures, such as headwall, curb and gutter, asphalt pavement, drainage inlets, concrete driveway, and sidewalk. • The project also includes sawing pavement, removing and reconstructing fence, and installing concrete flume with variable curb.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Sheila Briesch(Purchasing Manager)

[email protected]

Key dates

Opened
7/15/2026
Questions due
8/4/2026
Closes
8/11/2026

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
B26-023 Addendum 1

Budget estimate

$500,000 – $2,000,000

The budget for this project is estimated to be between $500,000 and $2,000,000. This estimate is based on the scope of the project, which includes the construction of stormwater infrastructure improvements, removal of existing structures, and installation of new structures. The factors that may influence the likely payment range include the complexity of the project, the materials and labor required, and the timeline for completion.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.