Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Construction
  5. ›Main Street Reconstruction Phase 2

City of Mountlake Terrace·Washington

Main Street Reconstruction Phase 2

Closes in 2 days$4M – $8MInvitation for BidLogin requiredFee to access
Get bids like this by emailBid source

Description

The City of Mountlake Terrace is seeking bids to reconstruct a 56th Avenue West corridor, adding travel lanes, bike lanes, sidewalks, lighting, and utility upgrades. The project involves full street/roadway reconstruction, drainage improvements, curb and gutter replacement, and traffic signal upgrades to meet ADA standards. • Rebuild existing roadway to two travel lanes with a two‑way left turn lane and dedicated bike lanes. • Replace curb, gutter, and sidewalks; install tree‑well sidewalks and LED pedestrian/street lighting. • Upgrade storm drainage, utilities (watermain, fiber optic), and traffic signals with accessible pedestrian push‑buttons.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Billy McKeever(Owner Contact)

[email protected]

(425) 744-6265

Key dates

Opened
10/16/2026
Closes
10/21/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
Quest Number: 10388062

Budget estimate

$4,000,000 – $8,000,000

The scope (roadway reconstruction, utility upgrades, lighting, and ADA improvements) suggests a contract value in the low‑to‑mid‑single‑digit millions. Based on comparable municipal street reconstruction projects of similar length (roughly a few hundred feet) and the extensive utility and lighting work, a reasonable estimate is between $4 million and $8 million. Factors influencing the range include material costs, utility relocation fees, and the extent of traffic signal integration.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

LA Public Works Engineering Bureau·California

Top match · 82%

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

City of Austin·Texas

82% match

South Lamar Blvd Corridor: US 290 to Montclaire St.

Rolling / TBD closeOpened 7/6/2026

City of Indianapolis·Indiana

82% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

Tacoma·Washington

81% match

Pedestrian Mobility & Safety Improvements at South 56th St and Pacific Ave

Closes 10/27/2026Opened 9/29/2026

City of Coronado·California

81% match

Downtown Enhancements – Phase 1

Closes 11/12/2026Opened 10/8/2026

City of Dania Beach·Florida

81% match

Sidewalk Rehabilitation Phase II

Closes 10/26/2026Opened 9/18/2026

City of Beaumont·Texas

81% match

Street Rehabilitation Citywide - Phase VII

Closes 10/22/2026Opened 10/1/2026

Texas City of San Antonio·Texas

80% match

Main Plaza Renovations

Closes 12/1/2026Opened 10/16/2026

City of San Antonio·Texas

80% match

23-03921A Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Rd) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Municipality of Anchorage·Alaska

80% match

Invitation to Bid No. 2026C044 – 4th Avenue Reconstruction (G Street → E Street, Project 21‑22)

Closes 10/22/2026Opened 10/7/2026

Texas City of San Antonio·Texas

80% match

Texas A&M University Area Streets (Maria Ferrier Ave. to Mauermann Road) Phase 2 (2022 Bond)

Closes 11/3/2026Opened 10/2/2026

Miami-Dade County Department of Transportation and Public Works·Florida

80% match

Resurfacing of SW 152nd Avenue FM 454982-1

Rolling / TBD closeOpened 8/28/2026

Grove City, OH·Ohio

80% match

Hawthorne Parkway Extension (Phase 2)

Closes 10/30/2026Opened 10/14/2026

LA Public Works Engineering Bureau·California

80% match

Benner Street (5966) Pipe and Board

Closes 10/28/2026Opened 9/30/2026

City of San Antonio·Texas

80% match

23-03895A District 9 Traffic and Mobility - Bitters Area (2022 Bond)

Closes 10/20/2026Opened 9/18/2026

City of Tyronza·Arkansas

80% match

Construction of Tyronza Hwy.118 Sidewalk Phase 1 (Main St.) (TAP‑24)(S)

Closes 11/10/2026Opened 10/18/2026

City of San Antonio·Texas

80% match

RFCSP 2026-118 Main Plaza Renovations

Closes 12/1/2026Opened 10/16/2026

Georgia City of Augusta·Georgia

80% match

#26-184 Greene Street Improvement Project (5th Street to 13th street)

Closes 10/22/2026Opened 9/21/2026

City of Austin·Texas

80% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

City of Madison·Wisconsin

80% match

Regent St Reconstruction

Closes 11/5/2026Opened 9/18/2026

Missouri Department of Transportation·Missouri

79% match

SE District, City of Desloge, sidewalk improvements to N. Desloge Drive

Closes 11/12/2026Opened 10/5/2026

Nevada Government·Nevada

79% match

D2 Little Lane Rehabilitation Project

Closes 10/20/2026Opened 9/22/2026

City of Fargo·North Dakota

79% match

BR-27-C1 - Paving and Utility Rehab/Reconstruction

Closes 11/18/2026Opened 10/17/2026

City of Hampton·Virginia

79% match

ITB 27-15/TM LITTLE BACK RIVER ROAD RECONSTRUCTION

Closes 11/3/2026Opened 9/30/2026

City of Indianapolis·Indiana

79% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/17/2026