Awarded vendors
- JAmes Adams & Son
Description
This contract calls for the design‑build construction of litter‑control structures and the repair/upgrade of drainage inlets across the Municipal Separate Stormwater System (MS4) throughout the City of Mobile. The work is a city‑wide civil‑engineering project targeting storm‑water infrastructure improvements, requiring an Alabama contractor’s license with a Municipal & Utility or Highways & Streets classification, performance and labor bonds, and compliance with prevailing‑wage rules. The solicitation was a sealed‑bid, competitive process with a mandatory pre‑bid conference and a bid submission deadline of December 14, 2016. The contract was awarded to James Adams & Son for $394,240.
• Scope: design‑build of litter‑control structures + drainage inlet repairs for the MS4 system city‑wide.
• Procurement: sealed‑bid competitive solicitation (Full and Open Competition).
• Requirements: Alabama contractor’s license (MU or HS), bid bond (5 % up to $10 k), performance bond (100 % of contract), prevailing‑wage compliance, insurance, and liquidated damages per ADOT specs.