Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Arkansas guideArkansas Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More manufacturing bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Arkansas
  4. ›Closed bids
  5. ›High Efficiency Condensing Fire Tube Boiler

Awarded contract·Arkansas State University·Arkansas

High Efficiency Condensing Fire Tube Boiler

Won by Jaco Sales$500kSingle Award
Contract source

Awarded vendors

  • Jaco Sales

Description

This contract concerns the procurement of a high‑efficiency condensing fire‑tube boiler for a state‑run entity. The solicitation (BID 20‑19) was opened on January 21 2020 and the award was made to Jaco Sales. The scope likely includes supply, delivery, installation, and commissioning of the boiler system, as well as any required training and warranty support. • Commodity: High‑efficiency condensing fire‑tube boiler (energy‑saving equipment). • Awarded Vendor: Jaco Sales (single‑vendor award). • Procurement Method: Full and open competition with bid opening on 21 Jan 2020; no award date or contract value disclosed. • Contact for bid results: [email protected] (Procurement Services).

Attached files

The award documents live at the source — open the contract source above to download them.

Key dates

Bids closed
1/21/2020

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Manufacturing
NAICS
333414
Solicitation №
BID 20-19

Contract value

$500,000

No monetary value is disclosed in the provided summary. A high‑efficiency condensing fire‑tube boiler for institutional use typically ranges from $150,000 to $1,000,000 depending on capacity, pressure rating, and ancillary services (installation, commissioning, warranty). Given the lack of size or capacity details, a mid‑range estimate of roughly $500,000 is reasonable for budgeting and comparison purposes. This figure assumes a medium‑sized boiler (≈5–10 MW thermal output) with full installation services.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

We’re still matching open opportunities to this contract — check back soon.