This contract concerns the rehabilitation of two ponds on the University of Minnesota campus – Patrick Ponds and Summit Woods Pond – encompassing a comprehensive suite of civil‑construction activities. The scope includes traffic control, erosion control, extensive earthwork and rock excavation, concrete curb and sidewalk installation, storm‑water pipe and manhole placement, outlet structure construction, landscaping, seeding, and environmental remediation such as contaminated material disposal. The bid tabulation reflects a total base‑bid value of $2.53 M, with line‑items ranging from a few hundred dollars to several hundred thousand dollars, indicating a mid‑size public‑sector infrastructure project that will likely require multiple specialized subcontractors.
• Primary work categories: site safety, erosion control, bulk earthmoving, concrete work, storm‑water infrastructure, and landscaping.
• Estimated contract value: $2,529,160 (base bid).
• Procurement status: bids received (full and open competition) as of 08 July 2026; award not yet disclosed.