Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wisconsin
  4. ›Closed bids
  5. ›N. Moreland Blvd. and Michigan Ave. Traffic Signal Improvements

Awarded contract·City of Waukesha·Wisconsin

N. Moreland Blvd. and Michigan Ave. Traffic Signal Improvements

Won by LaLonde Contractors, Inc.$445kSingle Award
Contract source

Awarded vendors

  • LaLonde Contractors, Inc.

Description

This contract concerns the upgrade and installation of traffic‑signal infrastructure at the intersection of N. Moreland Blvd. and Michigan Ave. in Waukesha, WI. The scope includes removal of existing curbs, gutters, and sidewalks; installation of new concrete curbs, gutters, sidewalks, and pavement; placement of traffic‑control equipment and detour signage; storm‑inlet and conduit work; and optional abandonment of an existing hydrant assembly. The base bid totals roughly $425 k, with a single optional alternate adding about $9 k, bringing the ceiling to approximately $435 k; the final tabulated total including adjustments is near $444 k. The solicitation was posted by the City of Waukesha, received bids on 20 Feb 2026, and lists LaLonde Contractors, Inc. as the likely awardee. • Fixed‑price, civil‑construction and traffic‑signal installation work • Includes extensive concrete, asphalt, and utility‑installation activities • Optional alternate for hydrant removal valued at $9 k • Two competing pricing sets (UofM and Zenith Tech) shown, but LaLonde appears as the awardee.

Attached files

Key dates

Bids closed
2/20/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237310

Contract value

$445,000

The bid tabulation lists a “Base Bid Total” of $424,970.02 and an optional alternate priced at $9,006.00, yielding a combined ceiling of $433,976.02. Additional line‑item totals and adjustments (liquidated‑damages penalties, etc.) bring the final displayed total to $443,946.86. Given that no award or change‑order amounts are noted, a reasonable estimate of the contract’s value is roughly $445,000, reflecting the base scope plus the optional alternate and typical contingency adjustments. Factors influencing this estimate include the extensive concrete and asphalt work, utility installation, and the presence of a single optional alternate.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Lowell, Arkansas·Arkansas

Top match · 73%

Lowell Traffic Signal Improvements (S)

Closes 10/28/2026Opened 10/4/2026

Massachusetts Town of Ashland·Massachusetts

72% match

Union and Fountain Street Intersection Traffic Signal Improvements

Closes 10/15/2026Opened 9/23/2026

City of Tracy·California

71% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

City of Evanston·Illinois

71% match

BID 26-45 Traffic Signal Improvements Project

Closes 10/20/2026Opened 8/27/2026

City of Suffolk·Virginia

70% match

Suffolk Downtown Traffic Signal Preemption System Enhancements

Closes 10/29/2026Opened 9/21/2026

City of Overland Park·Kansas

70% match

EBID - Traffic Signal Modifications 95th Street & Lowell / 99th Street & Antioch

Closes 10/27/2026Opened 9/29/2026

City of Tracy·California

70% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

City of Overland Park·Kansas

70% match

EBID - Traffic Signal Modifications 95th Street & Lowell / 99th Street & Antioch

Closes 10/27/2026Opened 9/29/2026

City of San Mateo·California

70% match

Peninsula Avenue and Delaware Street Traffic Signal Modification Project

Closes 10/15/2026Opened 9/17/2026

City of Waynesboro·Virginia

70% match

W. Broad Street & Arch Avenue Traffic Signal Replacement

Closes 10/20/2026Opened 9/23/2026

City of Hayward·California

70% match

Systemic Traffic Signals Improvements Project

Closes 10/16/2026Opened 9/17/2026

City of Overland Park·Kansas

69% match

EBID - Traffic Signal Modifications 95th Street & Lowell / 99th Street & Antioch

Closes 10/27/2026Opened 9/29/2026

City of Pueblo·Colorado

69% match

Roadway and Signalization Improvements - State Highway 45A (Pueblo Boulevard)

Closes 10/14/2026Opened 9/22/2026

Connecticut Town of New Milford·Connecticut

69% match

Town of New Milford Grove St & Hine Hill Rd Signal Installation

Closes 11/5/2026Opened 9/18/2026

City of Charlotte·North Carolina

69% match

Traffic Signal Installation and Maintenance

Rolling / TBD closeOpened 12/31/2026

City of Columbus·Indiana

69% match

Rocky Ford Rd. & Central Ave. Traffic Signal Modernization

Closes 10/20/2026Opened 9/30/2026

Missouri Department of Transportation·Missouri

69% match

STL District, City of St. Louis, Union traffic Management Enhancements

Closes 10/20/2026Opened 9/14/2026

Idaho Transportation Department·Idaho

69% match

Key No. 24276 RAMSEY RD SIGNAL UPGRADES, COEUR D’ALENE

Closes 10/20/2026Opened 9/30/2026

City of St. Louis Board of Public Service·Missouri

68% match

Traffic Management Enhancements, Phase VI – MLK Corridor

Closes 10/20/2026Opened 9/16/2026

Macomb County Department of Roads·Michigan

68% match

Innovative Traffic Signal Optimizations

Closes 11/3/2026Opened 10/7/2026

Texas Department of Transportation·Texas

67% match

STATE LET CONSTRUCTION CONTRACT, CASS CO, TRAFFIC SIGNAL IMPROVEMENTS

Closes 11/3/2026Opened 10/7/2026

Virginia Department of Transportation·Virginia

67% match

IFB 161065 Traffic Signal Maintenance

Closes 10/30/2026Opened 10/8/2026

City of San Diego·California

67% match

Front/Washington Signal Mod and Albatross/Washington HAWK

Closes 11/17/2026Opened 10/12/2026

Virginia Department of Transportation·Virginia

67% match

B17_2026 SMART SCALE - ITS SIGNAL UPGRADES

Closes 10/28/2026Opened 9/9/2026

Town of New Milford·Connecticut

67% match

Grove Street and Hine Hill Road Signal Installation Project, LOTCIP No. L095-0006

Closes 11/5/2026Opened 9/18/2026