The contract is for the construction of preload embankments at Exit 45 of the Maine Turnpike in the Town of Scarborough and City of South Portland, Maine. The work includes clearing, grubbing, wick drains, drainage layers, embankments, gravel, highway lighting, maintenance of traffic (including temporary ramps), and all other work incidental thereto in accordance with the Plans and Specifications. The contract was awarded to Sargent Corporation.
• The contract includes various items such as clearing, removing existing pavement surface, excavation, embankment, hot mix asphalt pavement, and more.
• The contract has a bid date of 08/27/19 11:00 AM.
• The contract is governed by the Maine Department of Transportation Standard Specifications, Revision of November 2014, with some modifications and additions.
• The contract includes a Stormwater Awareness Plan and a Targeted BMP Adoption Plan to minimize stormwater pollution.
• The contract has a detailed schedule of prices and a list of pay items.