Awarded vendors
- Sturgeon Electric Company, Inc.
Description
The contract calls for the design‑build‑assembly of two modular diesel‑generator power‑plant units for the remote communities of Clarks Point and Port Heiden, Alaska. The agency supplies owner‑furnished diesel engines and module structures; the contractor is responsible for off‑site shop assembly, testing, commissioning, and delivery to an Anchorage warehouse for later transport. Key requirements include full compliance with mechanical, electrical, and control‑system specifications, a one‑year warranty, performance and payment bonds equal to 100 % of the contract price, and adherence to DBE participation guidelines.
• Scope: shop fabrication, integration of engines, generators, low‑voltage switchgear, VFDs, SCADA, and associated piping, wiring, and insulation.
• Timeline: bids due Feb 22 2019; substantial completion targeted Aug 1 2019; final completion Aug 15 2019.
• Financials: engineer’s estimate $1.5‑$2.5 M; award to Sturgeon Electric at approximately $2.09 M total bid.