Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More environmental services bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Montana
  4. ›Closed bids
  5. ›Rest Area Septic Tank Pumping Billings Eastside

Awarded contract·Montana Department of Transportation (MDT)·Montana

Rest Area Septic Tank Pumping Billings Eastside

$187kSingle Award
Contract source

Description

The Montana Department of Transportation (MDT) is seeking bids for the Rest Area Septic Tank Pumping Billings Eastside project. The contract involves pumping out septic tank sites at three rest areas (Custer, Hardin, and Hysham) on an "as needed" basis. The contractor will be responsible for providing all labor, equipment, materials, and incidentals necessary to complete the work. The contract period is from December 1, 2025, to November 30, 2026. • The contract requires the contractor to clean and flush all chambers, properly dispose of all septic waste material, and restore the site to its original grade and appearance. • The contractor must also secure all permits and dumping fees required. • The MDT will be responsible for uncovering the septic tank chamber opening and providing the contractor with the locations of the tank openings at each site. • The contractor must complete the work within three working days of notification and must enforce all relevant federal, state, and local safety and health requirements.

Attached files

Key dates

Starts
12/1/2025
Ends
11/30/2026
Duration
1 years

Last updated

Details

Award type
Single Award
Industry
Environmental Services
NAICS
562991
Solicitation №
MDT-316271-RP

Contract value

$186,700

The value of the contract can be estimated based on the cost per pumping trip for each rest area. The total cost will depend on the frequency of pumping needed, which is not specified in the contract document. However, assuming an average of 4-6 pumping trips per year for each rest area, the total cost can be estimated as follows: - Custer Rest Area (2 sites): 2 x $4,500 x 4-6 trips/year = $36,000 - $54,000 per year - Hardin Rest Area (2 sites): 2 x $6,570 x 4-6 trips/year = $52,560 - $78,840 per year - Hysham Rest Area (1 site): 1 x $15,000 x 4-6 trips/year = $60,000 - $90,000 per year Total estimated annual cost: $148,560 - $223,840 Since the contract period is 1 year, the total contract value can be estimated as $148,560 - $223,840.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

We’re still matching open opportunities to this contract — check back soon.