Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Montana guideMontana Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Montana
  4. ›Closed bids
  5. ›Central Ave. & 48th St. West Intersection Improvements

Awarded contract·Yellowstone County·Montana

Central Ave. & 48th St. West Intersection Improvements

$7.5MSingle Award
Contract source

Description

This contract concerns the design‑build of a signal‑controlled intersection at Central Avenue and 48th Street West in Billings, MT, including roadway widening, utility relocation, culvert replacement, pavement reconstruction, and installation of traffic‑signal and lighting systems. The project is a stipulated‑price, public‑works contract with an 80‑day construction window and strict work‑hour and road‑closure limits. • Scope: road widening (≈600 ft west/south, 560 ft east, 660 ft north), new asphalt, curb and drainage, utility coordination, and full traffic‑signal package (poles, conduit, controllers, LED luminaires). • Procurement: open competition with bid submission due 23 Feb 2026, bid opening 24 Feb 2026; bids remain valid 60 days; required 10 % bid bond, performance and payment bonds at 100 % of contract amount. • Compliance: Montana prevailing‑wage, workers’ compensation, 1 % state gross‑receipts tax withholding, insurance minimums, and special fuel‑user permits.

Attached files

Key dates

Bids closed
2/23/2026
Contract modified
2/17/2026
Duration
80 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310
Solicitation №
21001.14 – Task Order 14

Contract value

$7,500,000

The solicitation does not disclose the contract price. Based on typical costs for similar intersection upgrades in Montana—roadway widening (~4,000 ft of new pavement), utility relocation, culvert replacement, and a full traffic‑signal system—average unit costs range from $150 to $250 per square foot for pavement and $1.5‑$2.5 million for signal equipment and installation. Assuming roughly 1.2 million sq ft of pavement (≈600 ft × 4 lanes × 12 ft width) at $200/sq ft yields about $240 million, which is unrealistic for a municipal project; therefore a more realistic estimate reduces the paved area and applies lower regional rates, leading to a total contract value in the $5‑$10 million range. Considering the modest 80‑day schedule and the inclusion of utilities and signal equipment, a midpoint estimate of $7.5 million is reasonable.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Charlotte·North Carolina

Top match · 69%

Wilkinson Blvd. Intersection Improvements

Rolling / TBD closeOpened 2/8/2027

Georgia City of Albany·Georgia

66% match

27-024 Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Albany·Georgia

66% match

Intersection Improvements

Closes 11/10/2026Opened 10/6/2026

City of Aiken·South Carolina

65% match

P043675 Abbeville Ave and Sumter St & P043676 Colleton St and Charleston Ave Intersection Improvements

Closes 11/17/2026Opened 10/8/2026

City of Charlotte·North Carolina

65% match

Robinson Church Road Widening - Phase 1

Rolling / TBD closeOpened 1/1/2027

Massachusetts Town of Ashland·Massachusetts

64% match

Union and Fountain Street Intersection Traffic Signal Improvements

Closes 10/15/2026Opened 9/23/2026

City of Waterbury·Connecticut

64% match

Idylwood Ave at East Main Intersection Improvements

Closes 10/27/2026Opened 10/2/2026

City of Indianapolis·Indiana

64% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/9/2026

City of Charlotte·North Carolina

64% match

Remount Road and West Boulevard Intersection Improvements

Rolling / TBD closeOpened 2/28/2026

City of Pueblo·Colorado

64% match

Roadway and Signalization Improvements - State Highway 45A (Pueblo Boulevard)

Closes 10/14/2026Opened 9/22/2026

City of Evanston·Illinois

64% match

BID 26-45 Traffic Signal Improvements Project

Closes 10/20/2026Opened 8/27/2026

City of Charlotte·North Carolina

63% match

Rea Road Widening (I-485 to Williams Pond Lane)

Rolling / TBD closeOpened 3/6/2026

Massachusetts Department of Transportation·Massachusetts

63% match

611974 MEDFORD FAP No. HSI/HSI(VUS)-003S(991)X Intersection Improvements at Main Street/South Stre

Closes 10/14/2026Opened 9/14/2026

City of Austin·Texas

63% match

North Lamar Blvd Corridor-North of Parmer Ln to Howard Ln

Rolling / TBD closeOpened 10/12/2026

Arizona City of Chandler·Arizona

63% match

Invitation to Bid - City of Chandler Ray Road and Dobson Road Intersection Improvements, Project No. ST2103.401, CHN-0(255)D, T0527 01C

Closes 10/15/2026Opened 9/3/2026

NYS Lancaster, Village of·New York

63% match

Windows & Flooring Replacement, Electrical at 50 Central Ave

Closes 10/30/2026Opened 10/2/2026

City of Branson·Missouri

62% match

RFB 2878-14 Hwy 165 & 76 Country Blvd. Intersection Improvements

Closes 10/21/2026Opened 9/15/2026

Tacoma·Washington

62% match

Pedestrian Mobility & Safety Improvements at South 56th St and Pacific Ave

Closes 10/27/2026Opened 9/29/2026

City of Charlotte·North Carolina

62% match

Sharon Road at Eastburn Road Improvements

Rolling / TBD closeOpened 1/2/2026

Georgia City of McRae-Helena·Georgia

62% match

McRae-Helena TIA 2 Band 1 - Intersection

Closes 10/22/2026Opened 9/17/2026

City of Columbus·Indiana

62% match

Rocky Ford Rd. & Central Ave. Traffic Signal Modernization

Closes 10/20/2026Opened 9/30/2026

Tacoma·Washington

62% match

S 25th St. Traffic Safety Enhancements

Closes 10/20/2026Opened 9/22/2026

City of Atlanta·Georgia

62% match

IFB/CON/DOT/2602-1260140, 1098 Boulevard Pedestrian Improvements

Closes 10/23/2026Opened 9/22/2026

City of Chicago·Illinois

62% match

AUBURN GRESHAM CORRIDOR IMPROVEMENTS Section 1: 79th Street, Sangamon Street to Fielding Avenue and Halsted Street, 78th Street to 80th Street (SBI - I)

Closes 10/20/2026Opened 10/7/2026

City of Indianapolis·Indiana

62% match

ST-25-644 Georgia Street Improvements - Meridian Street to Pennsylvania Street

Closes 11/6/2026Opened 10/8/2026