This contract concerns the design‑build upgrade of traffic signal infrastructure at the intersection of N. Moreland Boulevard and Michigan Avenue. The scope includes removal and replacement of existing curbs, gutters, sidewalks, and concrete medians; installation of new concrete curb, gutter, and sidewalk; pavement milling, hot‑mix asphalt patching, and base preparation; storm‑inlet protection and conduit work; and installation of city‑furnished traffic control equipment, signal cabinets, and related electrical hardware. An optional alternate allows for the abandonment of an existing hydrant assembly. The project is a fixed‑price bid, roughly $425 k for the base scope with an optional $9 k alternate, and a grand total (including adjustments) of about $444 k. Competing bidders were listed as “UofM” and “Zenith Tech Inc.” and LaLonde Contractors, Inc. appears as a bid submitter. The procurement was posted by the City of Waukesha and references Wisconsin Department of Transportation specifications, indicating a municipal‑state collaborative effort.