Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Wisconsin guideWisconsin Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Wisconsin
  4. ›Closed bids
  5. ›N Moreland Blvd and Michigan Ave Traffic Signal Improvements-BT.pdf

Awarded contract·City of Waukesha·Wisconsin

N Moreland Blvd and Michigan Ave Traffic Signal Improvements-BT.pdf

$444kSingle Award
Contract source

Description

This contract concerns the design‑build upgrade of traffic signal infrastructure at the intersection of N. Moreland Boulevard and Michigan Avenue. The scope includes removal and replacement of existing curbs, gutters, sidewalks, and concrete medians; installation of new concrete curb, gutter, and sidewalk; pavement milling, hot‑mix asphalt patching, and base preparation; storm‑inlet protection and conduit work; and installation of city‑furnished traffic control equipment, signal cabinets, and related electrical hardware. An optional alternate allows for the abandonment of an existing hydrant assembly. The project is a fixed‑price bid, roughly $425 k for the base scope with an optional $9 k alternate, and a grand total (including adjustments) of about $444 k. Competing bidders were listed as “UofM” and “Zenith Tech Inc.” and LaLonde Contractors, Inc. appears as a bid submitter. The procurement was posted by the City of Waukesha and references Wisconsin Department of Transportation specifications, indicating a municipal‑state collaborative effort.

Attached files

Key dates

Bids closed
2/20/2026

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Construction
NAICS
237310

Contract value

$444,000

The bid tabulation lists a Base Bid total of $424,970.02 and an optional Alternate #1 of $9,006.00, bringing the combined base‑plus‑alternate amount to $433,976.02. Adjustments for liquidated damages and pedestrian penalties reduce the subtotal to roughly $423,470. Additional line‑item totals (e.g., taxes/fees) appear to bring the final grand total to $443,946.86. Therefore the contract’s estimated value is approximately $444 k. This estimate assumes the final figure includes all mandatory fees and adjustments, and reflects the total amount the agency expects to spend on the awarded work.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

City of Hayward·California

Top match · 71%

Systemic Traffic Signals Improvements Project

Closes 10/16/2026Opened 9/17/2026

City of San Mateo·California

70% match

Peninsula Avenue and Delaware Street Traffic Signal Modification Project

Closes 10/15/2026Opened 9/17/2026

City of Tracy·California

70% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

Massachusetts Town of Ashland·Massachusetts

70% match

Union and Fountain Street Intersection Traffic Signal Improvements

Closes 10/15/2026Opened 9/23/2026

City of Evanston·Illinois

70% match

BID 26-45 Traffic Signal Improvements Project

Closes 10/20/2026Opened 8/27/2026

City of Tracy·California

70% match

Traffic Signal Installation at Tracy Boulevard and Gandy Dancer Drive

Closes 10/28/2026Opened 9/26/2026

City of Overland Park·Kansas

70% match

EBID - Traffic Signal Modifications 95th Street & Lowell / 99th Street & Antioch

Closes 10/27/2026Opened 9/29/2026

City of Lowell, Arkansas·Arkansas

70% match

Lowell Traffic Signal Improvements (S)

Closes 10/28/2026Opened 10/4/2026

City of Charlotte·North Carolina

70% match

Traffic Signal Installation and Maintenance

Rolling / TBD closeOpened 12/31/2026

City of Overland Park·Kansas

70% match

EBID - Traffic Signal Modifications 95th Street & Lowell / 99th Street & Antioch

Closes 10/27/2026Opened 9/29/2026

City of Overland Park·Kansas

69% match

EBID - Traffic Signal Modifications 95th Street & Lowell / 99th Street & Antioch

Closes 10/27/2026Opened 9/29/2026

City of Suffolk·Virginia

69% match

Suffolk Downtown Traffic Signal Preemption System Enhancements

Closes 10/29/2026Opened 9/21/2026

Missouri Department of Transportation·Missouri

68% match

STL District, City of St. Louis, Union traffic Management Enhancements

Closes 10/20/2026Opened 9/14/2026

Virginia Department of Transportation·Virginia

68% match

B17_2026 SMART SCALE - ITS SIGNAL UPGRADES

Closes 10/28/2026Opened 9/9/2026

City of Palmdale·California

68% match

HSIP Cycle 11 – Citywide Signal Modernization Project

Closes 10/13/2026Opened 9/1/2026

Contra Costa Transportation Authority·California

68% match

Countywide Smart Signals Project – IFB26‑C1

Closes 10/13/2026Opened 9/14/2026

Texas Department of Transportation·Texas

68% match

Traffic Signal Parts

Closes 10/21/2026Opened 9/30/2026

City of Waynesboro·Virginia

68% match

W. Broad Street & Arch Avenue Traffic Signal Replacement

Closes 10/20/2026Opened 9/23/2026

New York City Department of Transportation·New York

68% match

84126B0007-84126MBTR741 Retrofit of Signalized Intersections to Incorporate Accessible Pedestrian Signals

Closes 10/21/2026Opened 8/31/2026

LA Public Works Engineering Bureau·California

68% match

AVALON BOULEVARD IMPROVEMENTS MARTIN LUTHER KING JR BOULEVARD TO 56TH STREET (VISION ZERO PROGRAM)

Closes 11/4/2026Opened 9/30/2026

Connecticut Town of New Milford·Connecticut

68% match

Town of New Milford Grove St & Hine Hill Rd Signal Installation

Closes 11/5/2026Opened 9/18/2026

City of St. Louis Board of Public Service·Missouri

68% match

Traffic Management Enhancements, Phase VI – MLK Corridor

Closes 10/20/2026Opened 9/16/2026

Town of New Milford·Connecticut

68% match

Grove Street and Hine Hill Road Signal Installation Project, LOTCIP No. L095-0006

Closes 11/5/2026Opened 9/18/2026

City of Bakersfield·California

68% match

Adaptive Signal Coordination Along Ashe Road from Panama Lane to Club View Drive

Closes 10/29/2026Opened 10/8/2026

Idaho Transportation Department·Idaho

68% match

Key No. 24276 RAMSEY RD SIGNAL UPGRADES, COEUR D’ALENE

Closes 10/20/2026Opened 9/30/2026