Awarded vendors
- Rolfe Const. Co.
- Mid‑Cal Pipeline
- Smith Const. Co.
- RTC Construction
- TNT Industrial Contractors
- Floyd Johnston Construction
Description
This contract concerns the design‑build and construction of a new sanitary sewer lift station on Cooper Avenue in Merced, California. The project includes civil excavation, concrete work, pipe installation, mechanical pump systems, electrical controls, and associated site improvements such as curb, gutter, and asphalt resurfacing. Six local contractors were each awarded lump‑sum line‑item portions of the overall scope, indicating a split‑scope award rather than a single‑prime contract. The total estimated spend is in the range of $1.5 M to $2.0 M, with the primary construction cost reported at $755,825 and additional cost categories pushing the overall potential value above $1.8 M. The bid opening occurred on 15 August 2019, and the solicitation was closed on 15 August 2019 at 2:00 PM. No further contract dates, renewal terms, or vendor contact details are provided.
• Scope covers full lift‑station construction: civil works, mechanical pumps, electrical controls, and site finishes.
• Six local contractors received lump‑sum awards for distinct line‑items, suggesting a multi‑award contract structure.
• Estimated total contract value between $1.5 M and $2.0 M; primary construction cost $755,825.