Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • California guideCalifornia Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More water and wastewater bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›California
  4. ›Closed bids
  5. ›BID for Cooper Avenue Sanitary Sewer Lift Station

Awarded contract·City of Merced·California

BID for Cooper Avenue Sanitary Sewer Lift Station

Won by Rolfe Const. Co. +5 more$1.8MMultiple Award
Contract source

Awarded vendors

  • Rolfe Const. Co.
  • Mid‑Cal Pipeline
  • Smith Const. Co.
  • RTC Construction
  • TNT Industrial Contractors
  • Floyd Johnston Construction

Description

This contract concerns the design‑build and construction of a new sanitary sewer lift station on Cooper Avenue in Merced, California. The project includes civil excavation, concrete work, pipe installation, mechanical pump systems, electrical controls, and associated site improvements such as curb, gutter, and asphalt resurfacing. Six local contractors were each awarded lump‑sum line‑item portions of the overall scope, indicating a split‑scope award rather than a single‑prime contract. The total estimated spend is in the range of $1.5 M to $2.0 M, with the primary construction cost reported at $755,825 and additional cost categories pushing the overall potential value above $1.8 M. The bid opening occurred on 15 August 2019, and the solicitation was closed on 15 August 2019 at 2:00 PM. No further contract dates, renewal terms, or vendor contact details are provided. • Scope covers full lift‑station construction: civil works, mechanical pumps, electrical controls, and site finishes. • Six local contractors received lump‑sum awards for distinct line‑items, suggesting a multi‑award contract structure. • Estimated total contract value between $1.5 M and $2.0 M; primary construction cost $755,825.

Attached files

Key dates

Bids closed
8/15/2019

Last updated

Details

Award type
Multiple Award
Procurement
Full and Open Competition
Industry
Water Management and Sanitation
NAICS
237120
Solicitation №
114004

Contract value

$1,800,000

The bid results document lists a “Construction Cost” total of $755,825 and several additional cost blocks that range up to $1,044,689. Summing the primary construction cost with the largest additional block yields roughly $1.8 M. The document does not provide a single definitive “total award amount,” but the presence of multiple line‑item totals and the range of summed figures suggest the overall contract value lies between $1.5 M and $2.0 M. Using a midpoint of this range gives an estimated contract value of about $1,800,000. Factors influencing this estimate include: • The number of line‑items (31) and the lump‑sum nature of each award. • The variety of trades (civil, mechanical, electrical) which typically drive higher costs. • The separate cost categories shown in the PDF that together exceed $1.5 M.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

We’re still matching open opportunities to this contract — check back soon.