Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Illinois guideIllinois Bids and Bidding Guide
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Illinois
  4. ›Closed bids
  5. ›2026.07.08 Bunker Links Drainage System

Awarded contract·City of Galesburg·Illinois

2026.07.08 Bunker Links Drainage System

Won by Miller Trucking & Excavating$302kSingle Award
Contract source

Awarded vendors

  • Miller Trucking & Excavating

Description

The City of Galesburg awarded a design‑build contract for the drainage‑system installation on the Bunker Links Golf Course (Phase II). Miller Trucking & Excavating will install drainage across multiple holes, with a total contract value of just over $300 K and a tight 35‑day construction window. The work will begin in early October and finish by the end of December 2026, following a standard competitive bid process. • Scope: Design‑build installation of golf‑course drainage for specific holes (1, 2, 8, 9, 13, 14, 18). • Value: $301,721 total, paid as a lump‑sum award. • Timeline: Start Oct 1 2026, complete Dec 31 2026 (35 calendar days of actual work). • Vendor: Miller Trucking & Excavating (Silvis, IL) – sole awardee. • Procurement: Full and open competition, bid tabulated July 8 2026.

Attached files

Key dates

Bids closed
7/8/2026
Starts
10/1/2026
Ends
12/31/2026
Duration
35 days

Last updated

Details

Award type
Single Award
Procurement
Full and Open Competition
Industry
Civil Engineering
NAICS
237990

Contract value

$301,721

The bid tabulation explicitly lists a Grand Total (Award Amount) of $301,721.00, which represents the total contract price for the design‑build drainage installation. No additional costs, change orders, or performance bonds are disclosed, so the best estimate of the contract’s financial size is roughly $302 K. This figure is consistent with the line‑item costs provided and reflects a modest‑to‑medium municipal construction award.

AI estimate from the award documents

Similar open opportunities

Matched by Bid Banana AI™

We’re still matching open opportunities to this contract — check back soon.