Awarded vendors
- Mainline Contracting
- Simon
- Woelber Excavating
- Complete Concrete
- Black River
- Heavy Constructors
- Hayworth Enterprises
- Western Construction
Description
The County Heights Drainage Basin Improvement project involves the improvement of detention pond 101, including raising the top of dam elevation, relocating and raising the spillway elevation, replacing the existing 36" RCP with a 42" RCP outlet pipe, and constructing a riser at the inlet of the 42" RCP outlet pipe. The project also includes modifications to the pond 104 outlet structure. The estimated cost of the project is $245,000.00. The contract was awarded to multiple vendors, including Mainline Contracting, Simon, Woelber Excavating, Complete Concrete, Black River, Heavy Constructors, Hayworth Enterprises, and Western Construction.
• The project involves detention pond 101 improvements
• The estimated cost of the project is $245,000.00
• The contract was awarded to multiple vendors
• The project includes modifications to the pond 104 outlet structure
• The project involves raising the top of dam elevation and relocating and raising the spillway elevation