Description
This solicitation concerns the construction of a new 48‑inch sanitary sewer line as part of the Central College Subtrunk, Phase 3. The work will be performed using micro‑tunneling techniques through mixed soil and rock conditions, include the installation of 12 manholes, bypass pumping, and the abandonment of existing utilities. The contractor must be pre‑qualified for contracts exceeding $2 million and comply with WPCLF funding requirements.
• Approx. 10,926 ft of 48‑in. sanitary sewer installed via micro‑tunneling
• Includes 12 manholes, bypass pumping, and removal of existing infrastructure
• Requires specialized micro‑tunneling experience, WPCLF compliance, and $2 M+ pre‑qualification
Attached files
The solicitation documents live at the source — open the bid source above to download them.