Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Federal contracts (SAM.gov)The Ultimate Guide to SAM.gov Registration
  • Before you submitBid Response: 3 Common Mistakes When Submitting an RFP
More architecture bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Federal
  4. ›Contracts
  5. ›C1DA--A/E Replace Existing Substation A9 Project 642-26-117 NCO4 Co…
More bids in Pennsylvania →

U.S. Department Of Veterans Affairs·Pennsylvania

C1DA--A/E Replace Existing Substation A9 Project 642-26-117 NCO4 Construction East

Closes 5/13/2026$500k – $2MRequest for Qualification
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Department of Veterans Affairs is seeking professional Architectural and Engineering (A/E) services for the design of project 642-26-117, Replace Existing Substation A9. The project involves replacing the existing substation A9 and re-routing the existing outgoing main feeders into a standalone electrical space. The selected A/E firm will be required to provide all investigative surveys and verifications of as-built conditions, complete contract drawings, specifications, technical reports, and cost estimates for the scope of work. The firm will also be responsible for collaborating with the Medical Center staff and VA Design Guides to determine structural, architectural, mechanical, and electrical design requirements. • The project is located at the Corporal Michael J. Crescenz VA Medical Center in Philadelphia, PA. • The A/E firm will be required to adopt the make before break concept in directing the contractor on phasing the construction phase. • The firm will be responsible for providing a construction estimate of contract time and cost associated with their final drawings and specifications. • The firm will be evaluated based on technical expertise, professional qualifications, and firm capacity and management oversight.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Lamar Thomas(Contract Specialist)

[email protected]

(667) 392-1344

Key dates

Opened
2/12/2026
Closes
5/13/2026
Duration
180 days

Last updated

Details

Type
Request for Qualification
Industry
Architecture
NAICS
541330
Solicitation №
36C24426R0048

Budget estimate

$500,000 – $2,000,000

The budget for this opportunity is not explicitly stated in the document. However, based on the scope of work and the requirements, it is likely that the budget will be in the range of $500,000 to $2 million. This estimate is based on the fact that the project involves the design of a substation and requires engineering expertise, which can be a costly service. Additionally, the document mentions that the award of a Firm Fixed-Price contract is contemplated, which suggests that the budget will be a fixed amount.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.