The County of Santa Cruz is soliciting sealed bids for the reconstruction of a storm‑damaged segment of Soquel San Jose Road (mile‑post 5.55). The work follows California Department of Transportation 2025 standard specifications and includes traffic control, temporary structures, excavation, backfill, soldier‑pile walls, paving, erosion control, and associated environmental mitigation. The contract is a prevailing‑wage, federally‑aid project (ER‑15J2) and requires the successful bidder to furnish all labor, materials, equipment, bonds, insurance, and to complete the work within 40 working days after mobilization.
• Scope: full road‑repair package – traffic control, temporary signage, excavation, backfill, steel soldier piles, concrete work, asphalt paving, erosion‑control fabrics, hydroseeding, and site‑staging.
• Location: County of Santa Cruz, California (Soquel San Jose Rd, PM 5.55).
• Bid opening: November 5, 2026 (sealed bids).
• Performance period: 40 working days after the 15‑day post‑award notice period.
• Prevailing‑wage and federal‑aid compliance required.
• Bonds: 10 % bid bond, performance bond, payment bond; insurance and certifications mandated.
• Contractor must self‑perform at least a minimum percentage of the work (unspecified in excerpt).
• No pre‑bid meeting or site‑visit is stipulated in the provided text.