Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Maine guideMaine Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Maine
  4. ›P27-29 Mt. Hope Ave Sidewalk Project

City of Bangor·Maine

P27-29 Mt. Hope Ave Sidewalk Project

Closes 10/14/2026$800k – $1.5MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Bangor is seeking qualified contractors to construct a new 6‑foot‑wide sidewalk along a 0.45‑mile stretch of Mount Hope Avenue in Bangor, Maine. The scope includes installation of 15 catch basins, 4 drain manholes, 1,663 ft of storm‑drain pipe, concrete curb placement, ADA‑compliant detectable warning surfaces, regrading, tree trimming, and associated site work such as seeding and sign relocation. Bids must be submitted in a sealed envelope by 2:00 PM on 14 Oct 2026; a non‑mandatory pre‑bid meeting is scheduled for 30 Sept 2026. The contract will be awarded to the lowest qualified bidder, with work required to be completed by 30 Sept 2027. • Location: Mount Hope Avenue, Bangor, ME (approximately 0.45 mi from Saratoga Ave to Hogan Rd) • Primary work: sidewalk construction, curb, drainage, catch basins, ADA warnings, regrading, tree work, site restoration • Required documents: bid form, bid security (5 % of bid), bidder’s list, DBE compliance forms • Submission method: hand‑deliver or mail to 73 Harlow St., Bangor, ME or email [email protected] • Pre‑bid meeting: 30 Sept 2026, 9 AM, Paul Bunyan Room, City Hall (non‑mandatory) • Questions deadline: 7 Oct 2026, 4:30 PM • Completion deadline: 30 Sept 2027, with liquidated damages of $650 per day for late finish.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

[email protected]

Key dates

Opened
9/23/2026
Questions due
10/7/2026
Pre-bid meeting
9/30/2026
Closes
10/14/2026
Duration
12 months

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
P27-29

Budget estimate

$800,000 – $1,500,000

Based on typical municipal sidewalk projects of similar length (≈ 0.45 mi) and the inclusion of extensive drainage, curb, and ADA features, total construction costs in Maine generally range from $1.5 M to $2.5 M. Considering the relatively modest width (6 ft) and the use of standard concrete pavement, a reasonable estimate for the contract award is between $800,000 and $1,500,000. Factors influencing the final amount include material prices, subcontractor bids for specialty drainage work, and any unforeseen site conditions (e.g., tree removal or utility conflicts).

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Portland·Maine

Top match · 84%

2026 Forest Avenue Sidewalk Project (PDF, 88.12 KB)

Closes 11/4/2026Opened 10/9/2026

City of Newberry, Florida·Florida

84% match

Invitation to Bid 2026-03, City of Newberry SW 254th Street Extension from SW 7th Avenue to SW 10th Avenue

Closes 10/27/2026Opened 9/21/2026

County of DeKalb, GA·Georgia

84% match

Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

North Carolina Town of Cary·North Carolina

84% match

W Johnson St & Nottingham Dr Sidewalk Projects

Closes 10/29/2026Opened 10/1/2026

Georgia City of Sandy Springs·Georgia

83% match

Dunwoody Road Gap Fill Sidewalk T6026-2

Closes 11/13/2026Opened 10/13/2026

City of Hickory·North Carolina

83% match

BL-0066 Springs Road Sidewalk

Closes 10/15/2026Opened 9/25/2026

U.S. Department Of Transportation·Maine

83% match

Acadia National Park

Closes 11/10/2026Opened 10/9/2026

City of Dania Beach·Florida

83% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

Georgia Cherokee County Government·Georgia

83% match

2026-035, Arnold Mill Road Sidewalk Extension Project 81014

Closes 10/22/2026Opened 9/24/2026

Georgia DeKalb County Government·Georgia

82% match

2026-110-ITB Glenwood Sidewalk Improvement Project Phase III (24 Months)

Closes 11/6/2026Opened 10/5/2026

St. John the Baptist Parish Government·Louisiana

82% match

Bid 2026.20 Reserve Sidewalk Project

Closes 10/16/2026Opened 9/16/2026

County of DeKalb, GA·Georgia

82% match

Snapfinger Woods Sidewalk Construction with Pedestrian Hybrid Beacon (12 Months)

Closes 11/12/2026Opened 9/28/2026

City of Cleveland Tennessee·Tennessee

82% match

Bower Lane Sidewalk Project

Closes 10/20/2026Opened 9/28/2026

City of Waukegan·Illinois

82% match

FY2027 Sidewalk Program

Closes 10/20/2026Opened 10/6/2026

City of Manchester, Georgia·Georgia

82% match

Sidewalk Demolition & Replacement Project

Closes 10/29/2026Opened 9/28/2026

Connecticut City of Waterbury·Connecticut

82% match

Lakewood Rd Sidewalk Reconstruction State Project L151-0001

Closes 10/28/2026Opened 9/24/2026

Beaufort County, SC·South Carolina

82% match

S-70 Stuart Point Road Sidewalk

Closes 10/22/2026Opened 9/16/2026

California Department of Transportation·California

82% match

Construct sidewalk with fence, adjust and replace DIs.

Closes 10/22/2026Opened 9/21/2026

City of Cheyenne·Wyoming

81% match

Van Buren Ave - Street Curb and Gutter Improvements

Closes 10/27/2026Opened 9/23/2026

Georgia City of Augusta (Richmond County Recreation and Parks Department)·Georgia

81% match

26-183 15th Street Pedestrian Improvements (Government Road to Laney Walker Blvd.)

Closes 10/22/2026Opened 9/14/2026

City of Rancho Cordova·California

81% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

Georgia City of Eastman·Georgia

81% match

Eastman TIA 2 Pearl Bates & Creighton St

Closes 10/22/2026Opened 9/18/2026

Connecticut Town of Voluntown·Connecticut

81% match

Shetucket Tpke & Beach Pond Sidewalk Construction

Closes 11/13/2026Opened 10/8/2026

City of Waterbury·Connecticut

81% match

Lakewood Road Sidewalk Reconstruction; State Project No. L151-0001

Closes 10/28/2026Opened 9/24/2026

City of Stillwater·Oklahoma

81% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026