Description
The City of Cheyenne is seeking qualified contractors to perform comprehensive street‑level improvements on Van Buren Avenue. The scope includes installing a new 12‑inch water main with valves, fittings and fire hydrants, upgrading storm‑drain infrastructure, removing existing asphalt and chain‑link fencing, excavating and back‑filling, providing traffic and erosion control, and restoring the right‑of‑way with new asphalt, concrete curb and gutter, landscaping, riprap, signage, and related utilities. The contract will be awarded to the lowest responsible bidder that meets residency and bonding requirements, with a performance and payment bond equal to 100 % of the awarded price and a 5 % bid guarantee. Work is expected to begin after the Notice to Proceed (estimated December 1 2026) and be completed by April 30 2027.
• Install 12‑in. water main, valves, fire hydrants, and storm‑drain inlets.
• Remove existing asphalt, chain‑link fence, and perform excavation/back‑fill.
• Provide traffic control, erosion control, and site safety measures.
• Re‑pave with asphalt, install new concrete curb & gutter, landscaping, riprap, and signage.
• Required 5 % bid guarantee; 100 % performance/pay‑ment bonds; Wyoming labor/materials preference.
• Pre‑bid Zoom meeting (optional) on Oct 2 2026; bid submission deadline Oct 27 2026, 2 pm.