Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›Pedestrian Crossing Safety Improvements (FHWA)

City of Seattle·Washington

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026$200k – $500kInvitation for Bid
Get bids like this by emailBid source

Description

The City of Seattle is soliciting bids for a federally‑funded Pedestrian Crossing Safety Improvements project under the FHWA Highway Safety Improvement Program (HSIP). The scope includes sidewalk and pavement removal and restoration, pedestrian islands, curbs, curb ramps, drainage structures, RRFB and traffic signals, signing, channelization, and associated electrical and rebar work across multiple intersections in south‑Seattle. The engineer’s cost estimate is $3.25‑$3.35 million. Bidders must submit a bid guaranty of 5 % of the total bid, comply with federal, state, and local regulations (including FSBE goals, Buy‑America, and wage‑law certifications), and provide detailed subcontractor lists. All bids are to be entered electronically via OpenGov or mailed by USPS. • Location: Various intersections on 15th Ave S, 33rd Ave S, Rainier Ave S, etc., Seattle, WA. • Funding: HSIP FHWA Grant + Transportation Levy Fund (federal). • Estimated construction cost: $3.25‑$3.35 M. • Required certifications: FHWA Form 1273, FSBE participation (13 % goal), Buy‑America, wage‑law, non‑collusion, etc. • Bid guaranty: 5 % of total bid (including sales tax). • Submission method: OpenGov electronic entry or hard‑copy USPS. • Important dates: Bids open 11/04/2026; no deadline listed in the excerpt.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Nick Shrope

[email protected]

(206) 233-3925

Key dates

Opened
10/14/2026
Questions due
10/29/2026
Closes
11/4/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PW#2025-041

Budget estimate

$200,000 – $500,000

The engineer’s estimate places the total project cost at roughly $3.25‑$3.35 million. Assuming a typical contractor fee margin of 5‑15 % (including overhead, profit, and risk for a public‑sector civil works contract), the net earnings for the winning bidder would likely fall between about $200,000 and $500,000. The exact amount will depend on the final awarded contract price, any change orders, and the firm’s internal cost structure.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Seattle·Washington

Top match · 88%

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026Opened 10/14/2026

City of Seattle·Washington

88% match

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Seattle·Washington

87% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

Town of Westwood·Massachusetts

85% match

Pedestrian Safety Improvements

Rolling / TBD closeOpened 4/2/2026

Tacoma·Washington

83% match

S 25th St. Traffic Safety Enhancements

Closes 10/20/2026Opened 9/22/2026

City of Seattle·Washington

83% match

1st Ave NE Shared Use Path - N 120th to N 130th

Closes 10/28/2026Opened 10/7/2026

Tacoma·Washington

82% match

Pedestrian Mobility & Safety Improvements at South 56th St and Pacific Ave

Closes 10/27/2026Opened 9/29/2026

City of Seattle·Washington

82% match

Spot Sewer Rehabilitation Unit Price Contract 6

Closes 11/4/2026Opened 10/7/2026

New York City Department of Transportation·New York

82% match

84126B0007-84126MBTR741 Retrofit of Signalized Intersections to Incorporate Accessible Pedestrian Signals

Closes 10/21/2026Opened 8/31/2026

City of Sacramento·California

81% match

Pedestrian Crossing at R Street and 29th/30th Streets

Closes 10/28/2026Opened 9/30/2026

City of San Diego·California

81% match

Front/Washington Signal Mod and Albatross/Washington HAWK

Closes 11/17/2026Opened 10/12/2026

City of Cedar Rapids·Iowa

80% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Rancho Cordova·California

80% match

2026 ADA Sidewalk Improvement Project

Closes 10/21/2026Opened 9/30/2026

City of Minneapolis·Minnesota

80% match

BID-PW - Folwell Safe Routes to School

Closes 11/12/2026Opened 9/29/2026

Maryland-National Capital Park and Planning Commission·Maryland

80% match

Construction Services-Safe Streets for All: Georgia Avenue at Evans Parkway

Closes 10/20/2026Opened 9/9/2026

Nyc Department of Design and Construction·New York

80% match

85026B0094 - HWCSCHPQN - SAFE ROUTES TO SCHOOLS, QUEENS

Closes 11/9/2026Opened 6/22/2026

City of Seattle·Washington

80% match

Fall Protection System Maintenance

Closes 10/22/2026Opened 9/11/2026

BREC·Louisiana

80% match

SB 1878 Melvin Kip Holden Pedestrian Bridge Improvements at Harding Blvd

Closes 10/27/2026Opened 9/30/2026

City of Stillwater·Oklahoma

80% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

City of St. Louis Board of Public Service·Missouri

80% match

Removal & Replacement of Southwest & Columbia Bridges

Closes 11/10/2026Opened 10/7/2026

City of Dania Beach·Florida

80% match

Sidewalk Rehabilitation Phase II

Closes 10/19/2026Opened 9/18/2026

Town of Bluffton·South Carolina

80% match

Pathway Pedestrian Improvements Phase 3

Closes 11/12/2026Opened 10/13/2026

City of Cedar Rapids·Iowa

80% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Richmond·California

80% match

Harbour Way and Wright Avenue Safety Improvements - Section 130

Closes 10/29/2026Opened 10/7/2026

City of Smithville·Missouri

80% match

RFP 26-07 Bridge Street Roundabout Improvements

Closes 11/3/2026Opened 9/29/2026