Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Before you respond

  • Washington guideWashington Bids and Bidding Guide
  • Construction RFPsConstruction Bids and Bidding Guide
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More construction bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Washington
  4. ›East Marginal Way S Preservation (FHWA)

City of Seattle·Washington

East Marginal Way S Preservation (FHWA)

Closes 11/18/2026$8M – $12MInvitation for Bid
Get bids like this by emailBid source

Description

The City of Seattle is soliciting bids for the “East Marginal Way S Preservation” project, a federally‑funded $10.8 million roadway rehabilitation that includes pavement overlay, spot base repairs, re‑channelization for a protected bike lane and shared‑use path, curb ramps, sidewalks, drainage, signals, street lighting, signing, striping, landscaping, and associated utility work (rebar, electrical, HVAC, plumbing, structural steel). The scope covers demolition of existing pavement, concrete, and structures, extensive excavation, utility verification, installation of new concrete and asphalt pavement, curb and gutter, traffic control devices, signal heads, signage, and a range of landscape and storm‑water improvements. Bids open on 18 Nov 2026 and must be submitted via OpenGov (electronic) or hard‑copy USPS. The contractor must comply with FHWA federal‑aid requirements, Washington State labor and equal‑opportunity rules, and a 13 % FSBE participation goal. The project is expected to be a multi‑month construction effort requiring coordination with multiple trades and agencies. • Location: East Marginal Way S, Seattle, WA (from 1st Ave S to Tukwila city limits) • Funding: FHWA Preservation Grant + local funds • Estimated value: $10.8 M (engineer’s estimate) • Major work categories: demolition, excavation, utility relocation, new pavement (HMA/WMA), curb & gutter, sidewalks, bike‑lane infrastructure, traffic signals, signage, lighting, landscaping, storm‑water controls • Mandatory compliance: Federal‑aid (FHWA 1273), Washington State labor, FSBE 13 % goal, Buy‑America, non‑collusion, wage‑law certifications • Bid submission: OpenGov electronic entry or USPS hard copy; 5 % bid bond required • Pre‑qualification: Must hold Washington State contractor registration, UBI, business license, insurance, and SAM registration.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Abner Gallardo

[email protected]

(206) 684-8130

Key dates

Opened
10/14/2026
Questions due
11/12/2026
Closes
11/18/2026

Last updated

Details

Type
Invitation for Bid
Industry
Construction
NAICS
237310
Solicitation №
PW#2025-057

Budget estimate

$8,000,000 – $12,000,000

The engineer’s estimate for the project is $10,800,000, which typically translates to a contract award in the range of 80‑120 % of the estimate after accounting for contingencies, overhead, profit, and taxes. Assuming a standard 10 % profit margin and 5 % overhead, the net revenue to the contractor would likely fall between roughly $8 million (lower‑end, tight bidding) and $12 million (higher‑end, more generous scope interpretation). Factors influencing the final budget include the final bid amount, any change orders, the extent of FSBE participation (13 % requirement may affect subcontracting costs), and the inclusion of optional recycled‑material incentives.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one. Bid Banana has 1.6M+ bids and awards.

You found this bid by looking. Bid Banana searches open government bids across all 50 states, updated daily, so you stop hunting: save a search once and we email you your new matches, daily or weekly.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

City of Seattle·Washington

Top match · 93%

Roosevelt Way Preservation (FHWA)

Closes 11/4/2026Opened 10/7/2026

City of Seattle·Washington

88% match

Pedestrian Crossing Safety Improvements (FHWA)

Closes 11/4/2026Opened 10/14/2026

City of Seattle·Washington

85% match

1st Ave NE Shared Use Path - N 120th to N 130th

Closes 10/28/2026Opened 10/7/2026

City of Seattle·Washington

85% match

Highland Park Way SW Connection

Closes 11/4/2026Opened 10/14/2026

City of Seattle·Washington

83% match

Spot Sewer Rehabilitation Unit Price Contract 6

Closes 11/4/2026Opened 10/7/2026

U.S. Department Of Transportation·Washington

82% match

WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert Improvements

Closes 10/20/2026Opened 3/25/2026

City of Kalispell·Montana

81% match

West Montana Street Improvements Project Invitation to Bid

Closes 10/21/2026Opened 9/27/2026

City of Seattle·Washington

81% match

Roadway Construction Materials and Debris Disposal

Closes 11/9/2026Opened 10/9/2026

City of Newberry, Florida·Florida

81% match

Invitation to Bid 2026-03, City of Newberry SW 254th Street Extension from SW 7th Avenue to SW 10th Avenue

Closes 10/27/2026Opened 9/21/2026

City of Stillwater·Oklahoma

81% match

10th Avenue and Main Street Improvements Project 26TR12

Closes 11/4/2026Opened 10/10/2026

Tacoma·Washington

81% match

E Portland Ave (64-72) Overlay

Closes 10/27/2026Opened 9/29/2026

Tacoma·Washington

81% match

Pedestrian Mobility & Safety Improvements at South 56th St and Pacific Ave

Closes 10/27/2026Opened 9/29/2026

Snohomish County·Washington

81% match

2027 123rde Ave NE Culvert Replacements – RR48109, WC8109, UPI 21-20028

Closes 10/20/2026Opened 9/30/2026

U.S. Department Of Transportation·Washington

81% match

WA FWS LPO MULTI(1) Little Pend Oreille NWR Culvert Improvements

Closes 10/20/2026Opened 10/13/2026

U.S. Department Of Transportation·Washington

81% match

WA NP OLYM PMS(1), Pavement Preservation Olympic Phase 1; WA NP OLYM PMS(2), Pavement Preservation Olympic Phase 2; WA NP NOCA PMS(2), Pavement Preservation Stehekin; & WA FLAP JEFFER 91420(6), Upper Hoh Road Resurfacing

Closes 7/22/2028Opened 7/22/2026

City of Cedar Rapids·Iowa

80% match

8th Avenue Bridge Replacement and Floodwalls at Cedar River

Closes 11/4/2026Opened 8/26/2026

City of Modesto, CA·California

80% match

TUOLUMNE BOULEVARD PAVEMENT REHABILITATION

Closes 10/27/2026Opened 9/1/2026

New York City Department of Parks & Recreation·New York

80% match

M289-120M East River Esplanade E36-38 St Seawall Reconstruct

Closes 11/2/2026Opened 9/21/2026

City of Minneapolis·Minnesota

80% match

BID-PW - Folwell Safe Routes to School

Closes 11/12/2026Opened 9/29/2026

City of Oldsmar·Florida

80% match

State Street Drainage Ditch Improvements Project

Closes 11/19/2026Opened 9/25/2026

Washougal, WA·Washington

80% match

Exterior Property Abatement

Closes 10/20/2026Opened 10/6/2026

Nevada Government·Nevada

80% match

D2 Little Lane Rehabilitation Project

Closes 10/20/2026Opened 9/22/2026

Tacoma·Washington

80% match

S 25th St. Traffic Safety Enhancements

Closes 10/20/2026Opened 9/22/2026

City of Seattle·Washington

80% match

Gorge Powerhouse Crane Replacement

Closes 11/6/2026Opened 10/7/2026

City of Pueblo·Colorado

80% match

Construction of Sun Mountain Boulevard

Closes 11/4/2026Opened 9/22/2026