Bid Banana
PricingBid helpAPILog inStart free trial
Log inStart free trial

Learn more

  • Iowa guideIowa Bids and Bidding Guide
  • Pricing your bidWhy Your RFP Pricing Strategy Is Costing You
  • How to answer an IFBInvitation for Bid: You Just Received an IFB, Now What?
More civil engineering bids →Must-win bid? Bring in The Bid Lab →
Bid Banana
SearchPricingBid helpBrowse bidsAPISupportFAQPrivacy PolicyTerms of UseAI Use Policy

This website and its content is copyright of The Bid Lab © 2026. The Bid Lab is a trademark of Bid Lab, LLC. All rights reserved.

  1. Bid Banana
  2. ›Bids
  3. ›Iowa
  4. ›Closed bids
  5. ›26-06 Cer962218C (Cerro Gordo)

Iowa Agriculture and Land Stewardship·Iowa

26-06 Cer962218C (Cerro Gordo)

Closes 7/16/2026$350k – $400kInvitation for Bid
Bid source

This opportunity has closed.

Bid Banana tracks 1.6M+ bids and awards across all 50 states. Save a search and we'll email your new matches, daily or weekly — so the next one reaches you with time to bid.

Get alerted next time

Description

The Iowa Department of Agriculture and Land Stewardship is seeking bids for the construction of a Tile Zone nutrient reduction wetland in Cerro Gordo County. The project involves selective clearing, excavation, grading, installation of inlet and outlet concrete structures, tile installation, and seeding. The estimated construction cost range for this project is $350,000 to $400,000. The project includes around 33,356 cubic yards of earthwork, one inlet and one outlet concrete structures, two concrete manholes, 3,762 linear feet of tile installation, 22 tons of riprap, 1,202 square yards of turf reinforcement mat, and 10.2 acres of seeding. Key features of the project include: • Site preparation and stripping • Pollution control measures • Seeding and mulching for protective cover • Mobilization and demobilization • Subsurface drain investigation, removal, and repair • Removal of water • Excavation • Earthfill • Topsoil • Concrete • Tile drains for land drainage • Loose rock riprap • Geotextile The project is expected to be completed by June 15, 2027, with buffer seeding to be completed by June 30, 2027, and structural seeding to be completed by September 15, 2027.

Attached files

The solicitation documents live at the source — open the bid source above to download them.

Contact

Tracy Blocker(Contract Manager)

[email protected]

(515) 344-6279

Key dates

Opened
6/14/2026
Questions due
7/8/2026
Pre-bid meeting
7/1/2026
Closes
7/16/2026
Duration
3 months

Last updated

Details

Type
Invitation for Bid
Industry
Civil Engineering
NAICS
237990
Solicitation №
26-06 Cer962218C (Cerro Gordo)

Budget estimate

$350,000 – $400,000

Based on the estimated construction cost range of $350,000 to $400,000, it can be inferred that the budget for this project will likely fall within this range. The actual budget may vary depending on factors such as the complexity of the project, the experience and expertise of the contractor, and any unforeseen circumstances that may arise during construction.

AI estimate from the solicitation

Similar opportunities

Matched by Bid Banana AI™

Bid Banana · 1.6M+ bids and awards 🍌

You found this one too late. Don't find the next one too late.

Bid Banana searches open government bids across all 50 states, updated daily. Save a search once and we email you your new matches, daily or weekly, while there is still time to win them.

1.6M+
bids & awards
All 50
states
4,000+
agencies
Start your 7-day free trial

Plans from $49.99/month. Cancel anytime, no setup fees.

Built by The Bid Lab, answering RFPs since 2017.

We’re still matching similar opportunities to this one — check back soon.