Description
The project involves intersection improvements at Rt. N and Hopewell/Duello in St. Charles County, Missouri. The scope of work includes widening, paving, and installing traffic signals, sidewalks, and pedestrian ramps. The project aims to improve traffic flow and safety at the intersection. Key features of the project include:
• Widening of Rt. N and Hopewell/Duello to improve traffic flow
• Installation of traffic signals and pedestrian signals
• Construction of sidewalks, pedestrian ramps, and curb ramps
• Installation of storm sewers and drainage systems
• Paving and resurfacing of the intersection and surrounding roads
The project requires a range of skills and expertise, including civil engineering, traffic engineering, and construction management. The successful bidder will be responsible for completing the project within the specified timeframe and budget.
Attached files
The solicitation documents live at the source — open the bid source above to download them.