The Palm Beach County Board of Commissioners is soliciting sealed bids for Phase 3 of the LNA Southside Redevelopment Program at Palm Beach County Park Airport. The scope includes a 2,500 sq ft expansion of the existing airfield electrical vault, interior renovation, roof replacement, HVAC and fire‑protection system modifications, relocation of regulators, ALCMS control system, fiber‑optic and power/communication wiring, and an optional standby emergency generator replacement. Bidders must obtain full contract documents after September 7 2026, attend a non‑mandatory pre‑bid conference on September 15 2026, and may conduct a site visit the same day. A 5 % bid security is required, and all work must comply with federal labor, Davis‑Bacon, Buy‑America, and other applicable regulations.
• Location: Palm Beach County Park Airport (LNA), West Palm Beach, FL
• Bid opening: October 6 2026, 2:00 PM
• Pre‑bid conference: September 15 2026, 10:00 AM (optional)
• Site visit: September 15 2026, 1:00 PM (optional)
• Required qualifications: Florida‑licensed contractors, ability to meet federal contract requirements
• Key deliverables: expanded electrical vault, upgraded HVAC/fire‑protection, roof replacement, wiring relocation, optional generator swap