The City of Sacramento is soliciting a competitive sealedâbid for the designâbuild installation of a fullâtrashâcapture system at âSite 144â on the Iâ80 North Ditch. The contract covers demolition of existing concrete, installation of a manufacturerâprefabricated trashâcapture weir, associated civil works (concrete channel walls, earthwork, asphalt paving, access road, fencing, guardrails, and seeding), and all required permitting, testing, and warranty obligations. The work must be completed within 200 working days after the Notice to Proceed, with liquidated damages of $2,000 per day for any delay.
⢠Designâbuild of a certified trashâcapture weir and slideâgate system with fullâcapacity, waterâquality flow design.
⢠Extensive concrete, earthwork, and pavement construction, including removal of existing structures and installation of new channel walls, curb, and access road (â 1,175 SY).
⢠Installation of safety guardrails, chainâlink fencing, removable bollards, and siteâspecific erosionâcontrol measures; includes a oneâyear warranty and required performance testing.