This is a total small‑business set‑aside Invitation for Bids (IFB) to perform highway‑related rockfall mitigation work in Olympic National Park, Clallam County, WA. The scope includes design‑build installation of rockfall barriers, concrete barriers, guardrails, culverts, drainage, temporary and permanent traffic control, and associated site preparation over a 0.4‑mile stretch. The contractor must provide labor, equipment (dump trucks, excavators), materials, and comply with extensive safety, fire‑protection, and environmental requirements. All bids are sealed, paper‑only, and must include a bid bond, representations & certifications, and authority‑to‑sign documentation. The contract is a fixed‑price construction award with a completion deadline of 10/06/2027.
• Location: 9 mi south of Port Angeles, Olympic National Park, WA (Clallam County)
• Work: Rockfall mitigation, barrier installation, roadwork, drainage, traffic control, site prep
• Length: 0.4 mi of roadway
• Duration: ~10 months (completion by 06 Oct 2027)
• Funding: Total small‑business set‑aside, Federal Highway Administration
• Bid submission: Paper bids only, due 04 Nov 2026, 1400 hrs local time
• Mandatory bonds: Bid bond required; performance/payment bonds required after award
• Key contacts: Contracts G. Office,
[email protected], (360) 619‑7520