The City of Port Angeles is issuing a Request for Qualifications (RFQ) to obtain a qualified engineering firm to design the removal of an abandoned 27‑inch concrete‑encased sanitary force main that crosses Ennis Creek. The scope includes environmental permitting, civil design, preparation of 30 % and 60 % design packages, a final 100 % bid package, and construction‑phase support. The work must meet fish‑passage standards outlined in the Washington State Recreation and Conservation Office (RCO) and the BAFBRB Manual 22. The contract will be for up to two years, with the selected firm providing design services, permitting assistance, right‑of‑way documentation, and construction‑management support.
• Location: Ennis Creek, Port Angeles, WA (state jurisdiction)
• Services: Environmental permitting, civil/utility engineering design, bid‑set preparation, construction‑management support
• Deliverables: 30 % design plans, 60 % design plans & estimate, 100 % construction documents, permitting support, right‑of‑way documentation
• Schedule: RFQ posted 10/1/2026, questions due 10/23/2026, SOQ due 10/30/2026 (5 PM PST)
• Contract term: Up to 2 years, award at City Council discretion
• Funding: Grant‑funded (Washington State RCO, BAFBRB)
• Evaluation criteria: Responsiveness, reputation, references, relevant experience, staffing levels