The University of South Carolina is seeking a qualified contractor to replace the existing Parking Lot 7 at the Gregory Family YMCA in Lancaster, SC. The work includes full‑depth reclamation of the parking surface, minor regrading, sidewalk repairs, storm‑water ponding mitigation, and ADA‑compliant upgrades. The project is a design‑bid‑build contract with a lump‑sum bid, a construction cost range of $700,000‑$900,000, and requires performance and labor‑and‑material payment bonds equal to 100 % of the contract price. Bids are due 11 Dec 2026, with a mandatory pre‑bid conference on 21 Oct 2026. The contract will be awarded to the lowest responsive and responsible bidder.
• Scope: full‑depth removal & replacement of parking lot, asphalt paving, concrete sidewalks, storm‑drain utilities, ADA ramps.
• Location: 512 Hubbard Dr, Lancaster, SC 29720 (Gregory Family YMCA).
• Delivery method: Design‑Bid‑Build, lump‑sum.
• Required bonds: 5 % bid security, 100 % performance & labor‑material bonds.
• Pre‑bid conference mandatory (10/21/2026, 1 PM, on‑site).
• Bid submission: hand‑delivery or mail to 1600 Hampton St, Suite 721, Columbia, SC.